BNM YAPI İNŞ. SAN. TUR. İÇ ve DIŞ TİC. LTD. ŞTİ.



Benzer belgeler
COMPANY PRESENTATION Engineering Services Recent Project References Representations

GENÇ SARI İNŞ. TAAH. MÜH. ve TİC. LTD. ŞTİ. GENÇ SARI CONSTRUCTION COMPANY


Firmamız her türlü endüstriyel tesisin proje, imalat ve montaj safhalarında ihtiyaç duyulan hizmetlerin tamamını vermektedir.

Marmara ve Ege bölgesinde yaygın satış

GPA branded products can be used safely in city drinking water supply, agricultural irrigation systems, sprinkling and fountain systems,

Profil Boru Demir Çelik

Fiyat Listesi Price List 01/01/2018

Experiences with Self Consumption Projects

GPA branded products can be used safely in city drinking water supply, agricultural irrigation systems, sprinkling and fountain systems,

GPA branded products can be used safely in city drinking water supply, agricultural irrigation systems, sprinkling and fountain systems,

Doğal Gaz Enerji Dönüşüm Santrali Projesi, 478 MW Navoiy/Özbekistan

Yeni Yüzümüz ve Projelerimizle Yükselmeye Devam Ediyoruz

Fiyat Listesi Price List 01/01/2017

HAKKIMIZDA HAKKIMIZDA / ABOUT US /

WATER AND IRRIGATION SECTOR IN TURKEY


PCC 6505 PROFILE CUTTING LINE

METSAN METSAN. TEL : +90 (322) FAX : +90 (322)

a trademark of ALISTONE

HASAN ENERGY Co. Makine İmalat Dış Tic CATALOGUE

NOVAPAC Ambalaj San. Tic. A.Ş

TAAHHÜT İNŞAAT SAN. VE TİC. LTD. ŞTİ. CONSTRUCTION CO., LTD.

İNŞAAT TAAH. LTD. ŞTİ.

FLEXIBLE AIR DUCT PRODUCTION LINE

2 Tanıtım. Biz kimiz?

Model ZT 7728D ZT 9228D ZT 10728D

TRAVERTINE COLLECTION

Design & Project. Construction & Fabrication. Revision & Maintenance. Consulting & Operation

YAPI ATÖLYESİ. make difference.. DESIGN & CONSTRUCTION ENGINEERING ARCHITECTURE CONTRACTING. Design & Construction

GEO-Treat 2000 Series / Serisi. GEO-Treat 1000 Series / Serisi RESERVOIR TEMPERATURE HIGHER THAN 180 C RESERVOIR TEMPERATURE BETWEEN 120 C C

University (Yüksek Lisans) Selcuk University 75 / Mechanical Engineering Faculty, Mechanical Engineering

OTOMOTİV SAN. TİC. LTD. ŞTİ. OTOMOTİV YEDEK PARÇA İMALATI AUTOMOTIVE SPARE PART MANUFACTURING

Tuğra Makina bu katalogtaki tüm bilgiler üzerinde değișiklik yapma hakkı saklıdır. Tugra Makina all rights reserved to change all information in this

RUBBER PRODUCTION LINE

Yüz Tanımaya Dayalı Uygulamalar. (Özet)

PACKAGE STITCHING SYSTEMS KOLİ DİKİŞ SİSTEMLERİ. MAKİNA SAN.TİC.LTD.ŞTİ KOLİ DİKİŞ MAKİNALARI ve DİKİŞ TELİ İMALATI GÜVENİLİR ÜRETİMDE DOĞRU TERCİH

YÜKSELİŞ ASANSÖR. YÜKSELİŞ ASANSÖR. Hedefiniz Yükselmek İse Yükselmenin Yolu YÜKSELİŞ tir.

Projects Manufacturing Construction Energy Assembling

BMT YAPI MALZEMELERI SAN. VE DIS TIC. LTD. STI. ( BMT EXPORT )

UGC, aile şirketinde 2. kuşak olarak 19 yıl görev yapan Uğur GÜRBÜZ tarafından 2001 yılında kurulmuştur.

C O N T E N T S BHD BHD page 2-5 BHD page 6-9 BHD page BHD page page BHD

Hakkımızda. about us. İsa GÜR GÜR KALIP Yönetim Kurulu Başkanı

Ürün Kataloğu Product catalogue

Waspo ya Güvenebilirsiniz

GEO-Treat 2000 Series / Serisi. GEO-Treat 1000 Series / Serisi RESERVOIR TEMPERATURE HIGHER THAN 180 C RESERVOIR TEMPERATURE BETWEEN 120 C C

Firma Tanıtımı Company Introduction

MİSYONUMUZ OUR MISSION VİZYONUMUZ OUR VISION

BINDER. İstikrarlı Süreç Yönetimi İle Verimliliğin Sağlanması. Bir Örnek Araştırma

Hot Water 1 Hot Water 1997 Bypass System Bypass. Water Tube 1 SH Steam 1998 Duct System & Stack Duct System & Stack

reflectra Reflectra is a trademark of Asya Traffic INC.

best association for camshaft...

Was founded in 1967 by Narin Family ; active in industry since 1934 and currently one of the most prominent and established tourism groups in Turkey


Since KALE MUSLUK Sanayi ve Ticaret A.fi. KALE MUSLUK Manufacturing & Trd. Co. Inc. PRODUCT CATALOGUE

Hayatın tam merkezinde yeni bir hayat New life at the heart of the city

Privatization of Water Distribution and Sewerages Systems in Istanbul Assoc. Prof. Dr. Eyup DEBIK Menekse Koral Isik

TECHNICAL WIND RESOURCE CAPACITY of TURKEY (1/2)

Protoben. Baglama. Pulled. Lerida. pcs/kg Adet/kg. Calibration Boylama Calibration Boylama


ÜRÜN TEŞHİR STANDLARI ÜRETİMİ / DISPLAY DESIGN & PRODUCTION

Wick Drain. Machines - 7 -

AKDENİZ ÜNİVERSİTESİ MÜHENDİSLİK FAKÜLTESİ ÇEVRE MÜHENDİSLİĞİ BÖLÜMÜ ÇEV181 TEKNİK İNGİLİZCE I

KALİTE MÜHENDİSLİK VE ENDÜSTRİYEL HİZMETLER SAN. TİC. LTD. ŞTİ. QUALITY ENGINEERING AND INDUSTRIAL SERVICES IND. TRADE CO. LTD.

WHO WE ARE BİZ KİMİZ B-TEK METAL

DEKOM. Excellence in Electrics Electronics Electromechanics since 2001

Quarterly Statistics by Banks, Employees and Branches in Banking System

About Us I Hakkımızda

About Reflectra REFLECTIVE TRAFFIC SIGNS FOLDED PLASTIC TRAFFIC SIGNS OMEGA POLES CUSTOMIZED SIGNS PRODUCT CATALOGUE ISO


SOFRALARIN İNCİSİ PERAL OF THE TABLES

1. FİRMA BİLGİLERİ / COMPANY INFORMATION. Firma Adı Company Name. Firma Adresi Company Address. Telefon / Fax / Phone / Fax /

Difference in Technology.

CORPORATE PRESENTATION FILE. Marble, Granite, Travertine, Project, Design, Manufacturing. Dealer Technistone Aegean region


Food Engineering, University of Gaziantep, Faculty of Engineering, Gaziantep, Turkey Graduation date: July 2000.

KARDAN MAFSALLI & LİMİT ROTLU DİLATASYON KOMPANSATÖRLERİ

KALİTE MÜHENDİSLİK VE ENDÜSTRİYEL HİZMETLER SAN. TİC. LTD. ŞTİ. QUALITY ENGINEERING AND INDUSTRIAL SERVICES IND. TRADE CO. LTD.

We convert our experiencess and knowledge about aluminum into qualified products.

W(S&I) 1 ICB önce - prior Ekim/October 2010 Haziran/June 2011 Ekim / October 2011 Mart /March 2013*

Waspo ya Güvenebilirsiniz

Re - Sizing. Yıkama ve Kalibreleme Ünitesi

%100 YERLİ İMALAT En Zor Şartlarda En Yüksek Performans Tel:

M mar S stemler Arch tectural Systems

Dünya devinin gücünü hissedin

İstanbul a Hoşgeldiniz

w w w. k a r a k o s e i n s a a t. c o m

Bilfinger Water Technologies. Cazibeli Kanalizasyon Sistemi ile Vakum Kanalizasyon Sisteminin Maliyet Karşılaştırması

GÜNEŞ ENERJİ MONTAJ SİSTEMLERİ

ODA SOĞUTUCULARI UNIT AIR COOLERS. ısıtma ve soğutmanın ritmini biz belirliyoruz!.. we give the rhythm in terms of heating and cooling!..

AYDIN KOMPRESÖR. En Yüksek Performans. En Zor Şartlarda. %100 YERLİ İMALAT

VENTILATION MACHINERY

TAV FIRINI/ANNEALING FURNACE KULLANMA KLAVUZU / USER'S GUIDE


taşımak için tasarlandı

HAKKIMIZDA ABOUT US. kuruluşundan bugüne PVC granül sektöründe küresel ve etkin bir oyuncu olmaktır.

nareks is an Electrical Contracting and Automation Engineering company. nareks Elektrik Taahhüt ve Otomasyon Mühendislik firmasıdır.

B a n. Quarterly Statistics by Banks, Employees and Branches in Banking System. Report Code: DE13 July 2018

KALİTE, GÜVEN QUALITY, CONFIDENCE STARTER BATTERY PRODUCT CATALOG

Transkript:

BNM YAPI İNŞ. SAN. TUR. İÇ ve DIŞ TİC. LTD. ŞTİ. BNM YAPI İNŞ SAN TUR İÇ ve DIŞ TİC LTD ŞTİ Cami Sokak. Özveri Apt. No: 43 D: 11 34740 Suadiye İstanbul / TÜRKİYE Tel : (+90) 216 445 26 20 Fax: (+90) 216 445 26 21 Web: www.bnmyapi.com e-mail: bilgutay@bnmyapi.com Mobile: 00 90 532 662 19 94

1 / 38 CONTENTS 1. Front Page 0 2. Contents 1 3. Company Profile 3 4. Vision & Mission 4 5. Scope & Main Activities 5 6. Projects In AZERBAIJAN 6.1. Oğuz-Gabala-Baku Water Supply 6 Manufacturing GRP Fitting 6.2. Oğuz-Gabala-Baku Water Supply 7 Field Closure & Pipe Repair 7. Projects In TURKEY 7.1. Iskenderun Steel Factory Water Supply 8 Installation Of Cooling Pipes 7.2. 45MW GÜRMAT Geothermal Power Plant 10 Installation Of GRP Pipes 7.3. 919 MW ENERJİSA Bandırma CCPP 13 Cooling Water System 7.4. MMK-ATAKAŞ Steel Factor Plant1 20 Asit Regenerasyon Plant Piping 7.5. MMK-ATAKAŞ Steel Factor Plant 22 Reverse Osmos System Installation 7.6. 1050MW AKSA Antalya CCPP Project 26 Cover Concrete Walls with GRP 7.7. DARBOĞAZ ENERGY Hydro Power Project 27 Installation of GRP Pipes

2 / 38 8. Projects In LİBYA 8.1. Abu Ziyyan Ar Ruhebat Water Supply 29 Installation Of GRP Pipes 8.2. Bingazi Pressure Sewer Project 34 Int. Sealing of GRP Pipe Line and Joints 9. Projects In Turkish Republic Of Northern Cyprus TRNC 9.1. Güzelyurt & Bostancı Sewer & Drinking Water Transmission Line 36 Installation Of GRP Pipes

3 / 38 COMPANY PROFILE BNM YAPI Const. Co. is established on year 2006. With an experience of more than 15 years, we have mainly specialized on pipe installation and mechanical montage such as valve, compansator, pump and other accessories. We have well experience on installation of Glass Reinforced Plastic (GRP), High Density Polyethilen (HDPE), Steel (St)& Stainles Steel and UPVC pipe installation applications for Power Plant HRSG Piping, Cooling Water System, Endustrial Applicaitons, Irrigation, Raw Water & Waste WAter Transmission, Pressure Sewer & Sewer Network and other applications. Regst. Company Name : BNM YAPI İnşaat Sanayi Turizm İç ve Dış Ticaret Limited Şirketi. Registration Date : 2006 Country : İstanbul / Türkiye Registered Address : Cami Sok.Özveri Apt.No:43 D:11 Suadiye - İstanbul / TURKEY Phone No : 00 90 216 445 26 20 Fax : 00 90 216 445 26 21 e-mail web address : bilgutay@bnmyapi.com : www.bnmyapi.com BNM YAPI is made a partnership with PUL-TECH FRP and established a GRP pipe production plant in UŞAK / TURKEY named as EGEM BORU. EGEM BORU, manufacturing method of Glass Reinforced Plastic GRP pipes is the Hellical Filament Wound. Fiberglass pipes are manufactured in various diameters DN25mm DN 5.500mm, pressure classes of PN 1Bar PN 40Bar, stifness classes of SN2.500N/m 2 SN10.000N/m 2 and above and lengths usually 6,0 or 12 m and if required different lengths onto a rotating mandrel.

4 / 38 BRIEF INFO ABOUT VISION AND QUALITY POLICY Our vision is to be the leader company for piping application worldwide developing its experience and knowledge. Policy on quality is to over satisfy the expectations of our Clients and support the personal development of our employees. Policy on environment is to keep ecological balance, minimize the negative effects and to take necessary precautions in order to provide security of life, property and health of people and our employees that can be affected from our activities during the services we furnish. Registered Quality Certificates : BS EN ISO 9001: 2008 Registered Certificate No: 3430/BNM09B Documentation Date : 12. 01. 2009 Issue Date : 09. 01. 2012 Expiration Date : 11. 01. 2013 BS EN ISO 14001: 2004 Registered Certificate No: 3430/BNM14C Documentation Date : 12. 01. 2009 Issue Date : 09. 01. 2012 Expiration Date : 11. 01. 2013 OHSAS 18001: 2007 Registered Certificate No: 3430/BNM18A Documentation Date : 12. 01. 2009 Issue Date : 09. 01. 2012 Expiration Date : 11. 01. 2013

5 / 38 SCOPE & ACTIVITIES 1- Pipe installation and mechanical works such as valve, compansator, and other accessories and construction and civil works; a. Power Plant Cooling Water System Inst. b. Power Plant HRSG Boiler P91, P22, P11 Piping and Installation of Steam Drums c. Desalination Plant Piping and Installation of Pumps, Tanks, UF & RO System and Dosing System d. Water Transmission & Network lines, e. Sewer & Pressure Sewer Lines, f. Irrigation Network & Syphon Lines, g. Industrial Plants Piping, h. Treatment Plants Piping, i. Hydroelectric Plants Water Transmission Lines 2- Construction and Civil Works such as; a. Water Tanks, b. Valve Camber, c. Seal Pits d. Pump Station etc. 3- Design Works & Technical Consultancy for; a. Glass Reinforced Plastic (GRP) Pipe & Fitting Production, b. GRP Pipe Installation Applications, c. Joining Systems Of The Lines and Repair Methods, d. Renovation of Existing Pipe Lines, e. Buried Pipe Design Calculations, f. Thrust Block Design & Calculations, g. Stress & Flexibility Analysis of Pipe Line (CESARS II) 4- Manufacturing of GRP Fittings and Other Hand Lay-up Application on Jobsite; a. GRP Elbows, b. T Pieces, c. Reducers, d. Flanges, e. Special Type of Fittings f. Repair of GRP Pipes On Jobsite, g. Lamination Applications On Site 5- Construction Works; a. Construction works such as water tanks, valve chamber, seal pits etc are included in our scope. b. Turnkey Construction of Villas in İstanbul, Dalaman & Gökova

6 / 38 PROJECTS IN AZERBAIJAN 1 / 2 Oğuz-Gabala-Baku Water Supply Project AZERBAIJAN Project Owner Consultant Pipe Producer Pipe Type Pipe Properties Scope : AZERSU Joint Stock Company AZERBAIJAN : CES Consult Eng. Salzgitter GmbH GERMANY : AZKOMPOZIT Pipe Ind. AZERBAIJAN : Glass Reinforced Plastic (GRP) : DN2000mm, PN10Bar -PN20Bar : Design Calculations, Consultancy and Manufacturing of GRP Fittings Date : August 2007 - Completed 2008 Description of Project: Oğuz Gabala- Baku Water Supply Project is one of the longest water supply project in the world. Total Length of the project is about 250.000m. Diameter is DN2.000mm, and the pressure classes are PN10-16-20-25Bars. BNM YAPI committed to design including technical drawings and production of GRP fittings for the project in the factory who produces GRP pipes in AZERBAIJAN. Design calculations are approved by pipe producer and Client and the consultant of the project German company, CES. More than 330Pcs of DN 2.000mm diameter GRP fittings were produced for the project. Productions were completed within year 2008.

7 / 38 PROJECTS IN AZERBAIJAN 2 / 2 Oğuz-Gabala-Baku Water Supply Project AZERBAIJAN Project Owner Consultant : AZERSU Joint Stock Company AZERBAIJAN : CES Consult Eng. Salzgitter GmbH GERMANY Main Contractor : Hazinedaroğlu Cons Co. TURKEY Pipe Type : Glass Reinforced Plastic (GRP) Pipe Properties : DN2000mm, PN10Bar - PN20 Bar L= 250.000m Scope : Design Calculations, Consultancy and Repair and Field Closure for GRP Pipeline Date : April 2008 - Completed 2008 Description of Project: Oğuz Gabala- Baku Water Supply Project is one of the longest water supply project in the world. Total Length of the project is about 250.000m. Diameter is DN 2.000mm, and the pressure classes are PN10-16-20-25Bars. BNM YAPI committed to install GRP pipes and design and production of field closure of the installed pipe line. Design calculations are approved by contractor and client and the consultant of the project German company, CES. Productions were completed within 2008.

8 / 38 PROJECTS IN TURKEY 1 / 7 Iskenderun Steel Factory ISDEMİR Cooling Water Supply Project TURKEY Project Owner : Iskenderun Steel Factory Main Contractor : İşkaya Cons Co. Pipe Type : Glass Reinforced Plastic (GRP) Pipe Properties : DN2000mm PN10Bar SN 5.000N/m 2 Pipe Line Length: 22.500m Scope : Installation of GRP Pipes and Fittings, Placing pipes into casing by pulling or pushing (Jacking) for road or railway crossings, Concrete Works (Chamber construction, Trust Block,Vadi Crossing etc.,) Field Closure, Pipe Repair and GRP Hand Lay-Up Appl. on site. Date : October 2007 - July 2008 Description of Project: Water is supplied from Cevdetiye Regulator and convayed to ISDEMİR for Cooling purpose. Total Length of the project is about 52.000m. 22.500m of the pipeline is DN2.000mm GRP pipe and the remaining is Steel. Pressure class of the pipe line is PN10Bars. Pipe line has been followed to DSİ irrigation channel and crossed Iskenderun Adana main road 5times. Depth of trench is about 7m 11m.

9 / 38 BNM YAPI installed 22.500m of DN2.000mm GRP pipes and fittings, including construction of thrust blocks and chambers, concrete encasement for vadi crossings, and installation of pipes inside casing. Project were completed within year 2008. Pipe line is under operation.

10 / 38 PROJECTS IN TURKEY 2 / 7 45MW Germencik Geothermal Power Plant Project Installation of Cooling Water System TURKEY Project Owner : Gürmat Elektrik Üretim A.Ş Main Contractor : Güriş Cons Co. Pipe Type : Glass Reinforced Plastic (GRP) Pipe Properties : DN600-1200mm PN10Bar SN5.000N/m 2 Scope : Installation of GRP Pipes, Fittings with Field Layup Joint and Valves, Compansators and other Accessories. Date : November 2007- August 2008 Description of Project: Germencik Geothermal Power Plant Project is the biggest capacity geothermal power plant in Turkey. Its capacity is 47,4MW. Location of project is Germencik/Aydın/Turkey. Steam temperature in wells is about 200C0 and at the stream turbine entrance 140C0. GRP pipes were used for cooling system of the plant.there is a cooling tower with seven cells made by GRP Water. BNM YAPI installed DN600mm-1.200mm GRP pipes, fittings, including valves, expantion joint and other accessories between cooling tower and condencer for cooling water system of the power plant. The project in scope of BNM YAPI were completed within August 2008. Power plant is under operation since March 2009.

11 / 38 45MW Germencik Geothermal Power Plant Project

12 / 38 45MW Germencik Geothermal Power Plant Project

13 / 38 PROJECTS IN TURKEY 3 / 7 919MW BANDIRMA CCPP Project Installation of Cooling Water System TURKEY Project Owner : ENERJISA Enerji Üretim A.Ş. Main Contractor : A TEC Power Plant Systems Pipe Type Main Cooling Outfall Line : Glass Reinforced Plastic (GRP) : DN 2.400mm PN 6Bar : DN 2.000mm PN 6Bar Auxilary Cooling: DN 80mm DN 500mm Cooldown, Blowdown, Priming System:DN 80mm-350mm Scope : Erection of Cooling Water System of Bandırma CCPP. Including installation of GRP pipes, Valves, Compansators, Instruments, Steel Supports, Hangers, Backfilling the Trench, etc. Date : July 2009 September 2010 Description of Project: Bandırma CCPP project is one of the largest capcitiy power plant project in Turkey. Plant is located 26km far from Bandırma on the way of Çanakkale. Water will be taken from Marmara Sea with a depth of about -27m and

14 / 38 will be pumped to condencer for cooling purpose of the system. Then the water will be returned to sea. BNM YAPI installed Cooling Water System of the power plant. GRP pipes including Steel Supports, Valves, Compansators, Instruments and other accessories for Main and Auxilary Cooling water system of the Plant were installed by BNM YAPI. Scope: - Main Cooling Water System - Auxilary Cooling Water System - Condencer Priming System - Raw Water & Demin Water & Desalination System - Drainage System for the pits, condencer and others RETURN LINE (ENTRANCE OF JET CHAMBER) RETURN LINE (ENTRANCE OF JET CHAMBER)

15 / 38 MCW MAIN COOLING WATER SYSTEM SEAL PIT OUTLET SEAL PIT INLET MCW VALVES BEFORE CONDENCER ENTRANCE

16 / 38 MAIN COOLING WATER SYSTEM

17 / 38 AUX AUXILARY COOLING WATER SYSTES HEAT EXCHANGER PRIMING & VACUUM SYSTEM

18 / 38 CONDENCER DRAIN LINES MAIN & AUXILARY COOLING PUMP & BACKWASFILTER BACKWASH FILTER AUXILARY PUMP LINES

19 / 38 MAIN COOLING PUMP LINE

20 / 38 PROJECTS IN TURKEY 4 / 7 MMK ATAKAŞ STEEL FACTORY Asit Regeneration Plant Project Installation of GRP Pipes for the Project TURKEY Project Owner : MMK-ATAKAŞ METALURGY A.Ş. Pipe Properties : DN 700mm, PN 6Atm Date : 24.06.2010 01. 07. 2010 Description of Project: BNM YAPI installed GRP pipes for ARP unit of Plant. Pipes were joined using GRP lamination and flanges. Scope: - Installation of GRP pipes and Duct o Piping Seperator 1 - Absorber o Piping Seperator 2 - Venturi 2 o Piping Absorber - Ventulator o Piping Venturi 1 - Seperator 1

21 / 38 MMK ATAKAŞ STEEL FACTORY Asit Regeneration Plant Project

22 / 38 PROJECTS IN TURKEY 5 / 7 MMK ATAKAŞ STEEL FACTORY Reverse Osmoz System Installation of Pipes, Valves, Compansators and Other Aceessories for the Project TURKEY Project Owner : MMK-ATAKAŞ METALURGY A.Ş. Design & Supply : Water Group Pipe Type : HDPE & UPVC Pipe Pipe Properties : DN110mm - DN 800mm, PN 6-16Atm Date : 29.06.2010 20.10.2011 Description of Project: BNM YAPI has been installed HDPE & UPVC pipes, valves, compansators, steel supports, clamps and other accessories for the reverse ozmoz system. System Capacity 900m 3 /hr Scope: Installation of System o o o o Absorbtion of water with pumps Entrance and Exit to UF Filters Entrance & Exit to RO Filter Dosing System Installation

23 / 38 MMK ATAKAŞ STEEL FACTORY Reverse Osmoz System Pump Station

24 / 38 MMK ATAKAŞ STEEL FACTORY Reverse Osmoz System

25 / 38 MMK ATAKAŞ STEEL FACTORY Reverse Osmoz System

26 / 38 PROJECTS IN TURKEY 6 / 7 1050MW AKSA Antalya CCPP Project GRP Coating Of The Walls For Notrolization & Dekatyonization Tanks TURKEY Project Owner Application : AKSA ENERJİ ÜRETİM A.Ş. / TURKEY : Covering of the concrete walls with Glass Reinforced Plastic material Cover Area : 800m 2 Scope : Coating the concrete walls with Glass Reinforced Plastic GRP material against chemical material corrosion. Date : October 2008 October 2008 Description of Project: Internal face of the concrete tanks in demineralization water system (dekatyonize water tank, notrolization pool etc,) were covered with vinylester GRP against sulfur corrosion.

27 / 38 PROJECTS IN TURKEY 7 / 7 DARBOĞAZ ENERJİ HYDRO POWER PLANT PROJECT ALABALIK HES I & II GRP Pipe installation for Hydro Power Plant Project TURKEY Project Owner : DARBOĞAZ ENERJİ Main Contractor : YG İnş. Taah. Tur.Mad.San.Tic.Ltd.Şti. Date : August. 2010 June 2011 Description of Project: BNM YAPI installed GRP pipes and valves for water supply lines of the project. ALABALIK HES - I - Capacity: 11,5MW Regulator A Collecting Pit DN 1.800mm, PN10Atm Main Line L= 752m Regulator B Collecting Pit DN 1.100mm, PN10Atm Syphon Line L= 212m DN 1.400mm, PN10Atm Main Line L=1.626m Collecting Pit Loading Pit DN 1.600mm, PN10Atm Syphon Line L= 806m DN 2.000mm, PN10Atm Main Line L=1.411m ALABALIK HES - II - Capacity: 5MW Regulator A Loading Pit DN 1.800mm, PN10Atm Main Line L= 4.290m

28 / 38

29 / 38 PROJECTS IN LIBYA 1 / 2 Great Man-Made River Project Abu Ziyyan Ar Ruhebat Water Supply Project LIBYA Project Owner : The Management & Implementatıon Authorıty Of Great Man Made Rıver Project GMRA LOADING IN TURKEY Main Contractor : ÖZTAŞ & NGCC JV / TURKEY&LIBYA Pipe Type : Glass Reinforced Plastic (GRP) & HDPE Pipe Properties : DN600-1600mm, PN10-16-25Bar, SN5.000N/m 2 Main Line : 120.000m GRP Pipe Branch Line : 67.000m HDPE Pipe UNLOADING IN LIBYA Scope : Site Organization, Preparation of Pipe and Fitting Order Lists, Handling and Installation of GRP & HDPE Pipes and Fittings for Main and Branch Lines. Date : May 2008 July 2011 Abu Ziyyan-Yifran section (56.000m)is under operation.

30 / 38 Description of Project: UNLOADING AT JOBSITE Abu Ziyyan Ar Ruhebat water supply project is one of the important section of Great Man Made River Project which is the largest pipe line project in Libya and the world. Water is taken from Abu-Ziyyan Town Reservoir, 300.000m 3 capacity and convayed to Regulating Tank with a capacity of 27.000m 3 in Ar-Ruhebat Town. There is a Break Pressure Tank with a capacity of 13.000m 3 in Ar Rayayinnah town which is in the middle of the Project There are 44 Irrigation Tanks on the pipe line. Therefore totally 67.000m of branch line will be installed for these tank branches. BNM YAPI installed 120.000m of Main Lines of the project. Water is convayed to Yifran town which is around 56.000m far from water source. Pipe line installation was completed and the lines were tested. TRENCH EXCAVATION However while the final connection to Break Pressure Tank and Regulating Tanks was compliting a riot and civil commotion was occured in Libya. One of the first location for civil commotion was Zintan which is on the route of our pipeline. Accordingly Project was stopped and all people was returned back to their countries.

31 / 38 PREPERATION OF BACKFILL MATERIAL BACKFILLING BEDDING & COMPACTION TESTS

32 / 38 BACKFILLING & PIPE INSTALLATION

33 / 38 PIPE INSTALLATION & VALVE CONNECTION

34 / 38 PROJECTS IN LIBYA 2 / 2 Benghazi Supply & Installation of Sewage Project LIBYA ENTRANCE MANHOLE Project Owner : Benghazi Municipality / LIBYA Main Contractor : MRA Const Co. / TURKEY Pipe Type : Concrete Covered Glass Reinforced Plastic (GRP) Pipe Properties : DN1600mm, PN16Bar (Microtunnel Pipes) Length Of Line Scope : 500m : Internal lamination for the installed Concrete Covered GRP pipes. DAMAGED PIPE & JOINT Date : August 2008 September 2008 Description of Project: Benghazi Supply and installation sewage line project is one of the important project for Benghazi Municipality. REPAIRED PIPE & JOINED Benghazi infrastructure have been completely renewing. Waste water is convayed to treatment plant in Guarjha. GRP pipes with a concrete cover were used for micro tunneling. During jacking of pipes, GRP pipes were damaged with high jacking forces and all joints were leaking. BNM YAPI repaired, installed 500m of pressure waste water line.

35 / 38 Damaged lines were instpected and damaged sections were determined. About 500m of the line was laminated with GRP material with a thickness of 5mm. In order to keep flexibility at the joints special internal sealing were applied at each joints. GRP LAMINATION APPLICATION Pipe line was tested to P T16Bar and was started to operate at the end of 2008. The pipe line is succesfully under operation. FLEX JOINT GASKET APPLICATION

36 / 38 PROJECTS IN T.R.N.C 1 / 1 GÜZELYURT & BOSTANCI SEWER AND DRINKING WATER TRANSMITION LINE TURKISH REPUBLIC OF NORTHEREN CYPRUS T.R.N.C Project Owner Consultant : EUROPEAN UNION COMMISSION : GRONTMIJ A/S Main Contractor : HASELSAN İNŞ ve TİC LTD ŞTİ. Date : NOV. 2010 DEC. 2011 Scope : BNM YAPI installed HDPE pipes, manholes, house connections and valves for water supply network and sewer lines of the project. Installation of Corugated and HDPE Pipes for Waste Water & Drinking Water Network in TRNC Description Of Project : Project is owned by European Commission and followed, controlled and engineered by Grontmij A/S as a European Aid for TRNC. Scope of the Project is Construction of Sewerage & water Distribution Networks in Morphou/Güzelyurt & Bostancı region. Project is based on European Union and FIDIC Conditions of Contract For Construction

37 / 38 GÜZELYURT & BOSTANCI SEWER AND DRINKING WATER TRANSMITION LINE WASTE WATER TRANSMITION NETWORK 75mm Corugated HDPE Pipe 1.470m 150mm Corugated HDPE Pipe 225m 225mm Corugated HDPE Pipe 38.735m 315mm Corugated HDPE Pipe 9.645m 560mm Corugated HDPE Pipe 1.900m DRINKING WATER TRANSMITION NETWORK 32mm PN10 Bar HDPE Pipe 8.500m 64mm PN10 Bar HDPE Pipe 20.700m 90mm PN10 Bar HDPE Pipe 70m 110mm PN10 Bar HDPE Pipe 12.300m 160mm PN10 Bar HDPE Pipe 2.550m 225mm PN10 Bar HDPE Pipe 2.530m 355mm PN10 Bar HDPE Pipe 2.900m

38 / 38 INSTALLATION OF SEWERAGE & WATER NETWORKS