Doğal Gaz Enerji Dönüşüm Santrali Projesi, 478 MW Navoiy/Özbekistan

PCC 6505 PROFILE CUTTING LINE

nareks is an Electrical Contracting and Automation Engineering company. nareks Elektrik Taahhüt ve Otomasyon Mühendislik firmasıdır.

HASAN ENERGY Co. Makine İmalat Dış Tic CATALOGUE

BINDER. İstikrarlı Süreç Yönetimi İle Verimliliğin Sağlanması. Bir Örnek Araştırma

nareks is an Electrical/Mechanical Contracting and Automation Engineering company.

Kalite, Quality, Verimlilik ve Productivity and Çevreye Duyarlılık Environmental Sensibility

zeytinist

Design & Project. Construction & Fabrication. Revision & Maintenance. Consulting & Operation

PASLANMAZ BORULU ULTRAFİLTRASYON SİSTEMİ ULTRAFILTRATION SYSTEM WITH STAINLESS STEEL PIPE PVC BORULU ULTRAFİLTRASYON SİSTEMİ

1. YARIYIL 2. YARIYIL. No Ders Kodu Ders Adı T U Kredi ECTS No Ders Kodu Ders Adı T U Kredi ECTS Atatürk İlkeleri ve İnkılap Tarihi I

ATIKSU TESİSLERİ HAKKINDA TAVSİYELER

BMT YAPI MALZEMELERI SAN. VE DIS TIC. LTD. STI. ( BMT EXPORT )

GERİ YIKAMALI OTOMATİK FİLTRE AUTOMATIC SELF CLEANING FILTER

Water, Wastewater and Waste Management Services in İstanbul

ARENCO Check~UP REGISTRATION FORM

METSAN METSAN. TEL : +90 (322) FAX : +90 (322)

AKDENİZ ÜNİVERSİTESİ MÜHENDİSLİK FAKÜLTESİ ÇEVRE MÜHENDİSLİĞİ BÖLÜMÜ ÇEV181 TEKNİK İNGİLİZCE I

ARSİMAK PROSEPTIC PAKET ARITMA GRUBU COMPACT SEWAGE TREATMENT.

aircoolers Evaporatörler Aircoolers TAVAN TİPİ EVAPORATÖRLER CEILING TYPE AIR COOLERS DUVAR TİPİ EVAPORATÖRLER WALL TYPE AIR COOLERS

- Monoblok Pompalar - Monoblock Pumps

COMPANY PRESENTATION FİRMA TANITIM DOSYASI

REVERSE OSMOSİS SİSTEMLERİ REVERSE OSMOSIS SYSTEMS

Tam Otomasyonlu CIP Sistemleri Full Automation CIP Systems

REVERSE OSMOSİS SİSTEMLERİ REVERSE OSMOSIS SYSTEMS

Hot Water 1 Hot Water 1997 Bypass System Bypass. Water Tube 1 SH Steam 1998 Duct System & Stack Duct System & Stack

İŞ MERKEZLERİ VE YÖNETİM YAPILARI BUSINESS CENTERS AND ADMINISTRATION BUILDINGS VIII. 23

Projects Manufacturing Construction Energy Assembling

WORK COMPLETION CERTIFICATES

MOGAN GÖLÜ TARAMA PROJESİ MOGAN LAKE DREDGING PROJECT. Newtech Chemical Company NCC

-NEW OFFICE PROJECT AT ETİLER- OFFICES FOR LEASE

UGC, aile şirketinde 2. kuşak olarak 19 yıl görev yapan Uğur GÜRBÜZ tarafından 2001 yılında kurulmuştur.

REFERENCE LIST / REFERANS LİSTESİ

Ürün Kataloğu Product catalogue

EKOL LOJİSTİK YALOVA RORO LİMANI

T.C. NECMETTĠN ERBAKAN ÜNĠVERSĠTESĠ MÜHENDĠSLĠK VE MĠMARLIK FAKÜLTESĠ, ÇEVRE MÜHENDĠSLĠĞĠ BÖLÜMÜ, AKADEMĠK YILI ÖĞRETĠM PLANI / T.

Experiences with Self Consumption Projects

HAKKIMIZDA / ABOUT US

İTÜ DERS KATALOG FORMU (COURSE CATALOGUE FORM)

AKTS/ ECTS KREDĠ/ CREDITS

Tanrıkulu şirketler grubu kâğıt metal ve plastik olmak üzere üç ana dalda, İstanbul, Kocaeli ve Sakarya gibi üç büyük şehirde 1989 yılından beri


2

PACKAGE STITCHING SYSTEMS KOLİ DİKİŞ SİSTEMLERİ. MAKİNA SAN.TİC.LTD.ŞTİ KOLİ DİKİŞ MAKİNALARI ve DİKİŞ TELİ İMALATI GÜVENİLİR ÜRETİMDE DOĞRU TERCİH

Marmara ve Ege bölgesinde yaygın satış

Tesmont. Firma Tanıtım Dosyası Firma Tanıtım Dosyası Company Introduction File Company Introduction File PROJE MÜHENDİSLİK ELEKTRİK MEKANİK TAAHHÜT

SATIŞINI YAPTIĞIMIZ ÜRÜNLER

İhtiyacınız olan ürünleri mail ile bildirip iskontolu fiyatlarımızı talep edin waterfun ürünlerinde de en uygun fiyatlarla hizmetinizdeyiz.

ULUSLARARASI DiZAYN infi. VE TiC.LTD.fiTi.

ŞİRKET PROFİLİ ve ÜRÜN ÇEŞİTLERİ COMPANY PROFILE & PRODUCT RANGE

OTOMOTİV SAN. TİC. LTD. ŞTİ. OTOMOTİV YEDEK PARÇA İMALATI AUTOMOTIVE SPARE PART MANUFACTURING

2014 MÜFREDATI MÜHENDİSLİK FAKÜLTESİ / ÇEVRE MÜHENDİSLİĞİ EĞİTİM PLANI

Asansörün olduğu her yerde ; ileri teknoloji, üstün kalite... Advanced technology, high quality.. Ürün Kataloğu Product Catalog

SELECTION OF THE OPTIMUM CLEANING TECHNOLOGY

QUESTIONNAIRE/SPECIFICATION INERTING SYSTEM CO2 CO2 INERTIZASYON SİSTEMİ TEKNİK ÖZELLİKLER BİLGİ FORMU

WATER AND IRRIGATION SECTOR IN TURKEY

erduro.com SINGLE STAGE SELF PRIMING PUMPS

ULUSLARARASI DiZAYN infi. VE TiC.LTD.fiTi.

GEO-Treat 2000 Series / Serisi. GEO-Treat 1000 Series / Serisi RESERVOIR TEMPERATURE HIGHER THAN 180 C RESERVOIR TEMPERATURE BETWEEN 120 C C

VERİMLİLİĞİ YÜKSEK ÇEVRE DOSTU YENİLİKÇİ ÜRÜNLER & ÇÖZÜMLER ENERGY EFFICIENT ENVIRONMENT FRIENDLY INNOVATIVE PRODUCTS & SOLUTIONS

EK-1 (Mülga:RG-1/4/ )

VENTILATION MACHINERY

VHR ER ENERJİ GERİ KAZANIM CİHAZLARI VHR ER ENERGY RECOVERY UNITS

TURBOSAN TURBOMAKINALAR SAN. VE TIC. A.S. MAKİNE İHTİSAS ORGANİZE SANAYİ BÖLGESİ 5. CADDE NO: DİLOVASI / KOCAELİ - TURKEY Phone:

MEDICAL GAS DISTRIBUTION NETWORKS MEDİKAL GAZ TESİSAT BORULARI

Dünya devinin gücünü hissedin

Serpantinli Boyler Serpentine Boiler. Silindirik Depolar aşağıdaki özelliklerde üretilmektedir;

KALİTE MÜHENDİSLİK VE ENDÜSTRİYEL HİZMETLER SAN. TİC. LTD. ŞTİ. QUALITY ENGINEERING AND INDUSTRIAL SERVICES IND. TRADE CO. LTD.

Argemip 5746 Semineri Siemens Sunumu

İNŞAAT TAAH. LTD. ŞTİ.

University (Yüksek Lisans) Selcuk University 75 / Mechanical Engineering Faculty, Mechanical Engineering

FLEXIBLE AIR DUCT PRODUCTION LINE

EK-1 EK-2. Bütün çeşitleri ve sınıfları. Bütün çeşitleri ve sınıfları. Bütün çeşitleri ve sınıfları. 26 mm çapında (T8) lambalar,

AĞIR YAĞ SIVI YAKIT BRÜLÖRLERİ FUEL OIL BURNERS

H48.33b FILTER DRIER SHELLS KARTUŞ KOVANLARI. H48.33b.54.1

Inspection Report Muayene Raporu KARE MÜHENDİSLİK ÇEVRE TEKNOLOJİLERİ SAN. TİC. A.Ş. SOLAR WATER HUMANITARIAN PROJECT

"Kaliteli Hizmet" "Quality Service"

TAAHHÜT İNŞAAT SAN. VE TİC. LTD. ŞTİ. CONSTRUCTION CO., LTD.

TETKİK VE DEĞERLENDİRME INVESTIGATION AND EVALUATION VIII. 82

Technical Requirements for Large Combustion Plants (LCPs)

ÇEVRE TEKNOLOJİLERİNDE ÇÖZÜM ORTAĞINIZ

Trusted solution partner

GEO-Treat 2000 Series / Serisi. GEO-Treat 1000 Series / Serisi RESERVOIR TEMPERATURE HIGHER THAN 180 C RESERVOIR TEMPERATURE BETWEEN 120 C C

METAL SANAYİ VE TİC. LTD. ŞTİ.

RMF A.Ş. Ürün Kataloğu 2017 / Product Catalog 2017

GPA branded products can be used safely in city drinking water supply, agricultural irrigation systems, sprinkling and fountain systems,

We convert our experiencess and knowledge about aluminum into qualified products.

Marmara ve Ege bölgesinde yaygın satış

Çevre Sorunlarınıza Etkili ve Ekonomik Çözümler Effectual and Economical Solutions For Your Environmental Problems

ERTMS/ETCS Implementations in Turkey Fatih Sarıkoç Ph.D. Control&Computer Engineer Turkish Sate Railways

ÖZGEÇMİŞ. ADİLE EVREN TUĞTAŞ, PhD

KSO ŞAHABETTİN BİLGİSU ÇEVRE ÖDÜLLERİ BUGÜNE KADAR ÖDÜL ALAN FİRMALARIN LİSTESİ

Beton Santralleri Concrete Batching Plants

1000 Series / Serisi 2000 Series / Serisi 3000 Series / Serisi 4000 Series / Serisi

GPA branded products can be used safely in city drinking water supply, agricultural irrigation systems, sprinkling and fountain systems,

Marmara ve Ege bölgesinde yaygın satış

Transkript:

BALAKHANI BAKU MUNICIPALITY (GÖKŞİN İNŞAAT) Balakhani - Baku (Azerbaijan) Municipality Leachate Treatment Plant Project Date : 28.10.2015 Period : 28.05.2016 Construction of 80 m3 /day capacity Leachate Treatment Plant All mechanical equipments supply and erection in Container housing, start-up, training, supervision for operation of plant at site for 1 month and remote supervision for operation of plant for 2 months All electrical equipments and instrumentation supply, operation of PLC and Operator panel and automatic control of plant, Pressurised Multilayer Sand Filters High Pressure Reverse Osmosis Unit (1.Pass) High Pressure Reverse Osmosis Unit (2.Pass) Supply of permeate and concentrate Tanks and transfer pumps, Supply of Storage tanks for acid, caustic, antiscalant and other chemicals, Supply of Dosing systems for acid, caustic, antiscalant and other chemicals, Supervision for operation of plant at site for 1 month and remote supervision for operation of plant for 2 months

MINISTRY OF ENVIRONMENT AND URBANISATION DEPARTMENT OF EUROPEAN UNION INVESTMENTS Construction of Merzifon Waste Water Treatment Plant Date : 16.12.2015 Period : 08.06.2017 Design Works for Merzifon Waste Water Treatment Plant, Construction of Biological Waste Water Treatment Plant of 8.952 m3/day capacity (44.760 Population Equivalent), treating carboneous content of sewage, All mechanical equipment s and laboratory equipments supply, erection, start-up and training All electrical equipment s and instrumentation supply, operation of PLC and SCADA and automatic control of plant, Aerated Grit and Oil Chamber, Aeration Basins (3.936 m3) Final Clarifiers Aerobic Sludge Stabilization System, Sludge Dewatering Building, Sludge Stock Area, Odour Removal System, Aearation Basin Blower Building, Operation Building, All Civil Works, Operation of plant for 90 days, Providing technical guiding and assistance for Merzifon Waste Water Treatment Plant for 1 year period.

MINISTRY OF WATER and FOREST Nevşehir Potable Water Treatment Plant Date : 04.02.2015 Period : 29.05.2017 Hardness and Sulphate Removing Potable Water Treatment Plant of 52.531 m3/day capacity, through Ultrafiltration and Reverse Osmosis System Design and Project Execution, Supply of all the mechanical equipments and laboratory equipments, installation, commissioning, training and Operation of the Plant for 1 year Supply of all electrical equipments and instruments, automation & control of the plant through PLC & SCADA and telemetry. System Feeding Pumps Micro Filtration Ultrafiltration System UF Permeate Tank and CIP System Reverse Osmosis Feeding and High Pressure Pumps Reverse Osmosis System Chemicals Preparation, Storage and Dosing Systems Pre-treatment and Raw Water Storage Basin Gas Chlorine System Administrative and Operation Building, Transformer and Generator Building All civil works Operation of the plant for 365 days

MINISTRY OF ENVIRONMENT AND URBANISATION DEPARTMENT OF EUROPEAN UNION INVESTMENTS Construction of Bartın WWTP and The Waste Water Collection, Preliminary Treatment and Sea Outfall in Inkumu Date : 30.09.2014 Period : 29.09.2016 Design Works for Bartın Waste Water Treatment Plant, Preliminary Treatment and Sea Outfall in Inkumu, Construction of BARTIN Waste Water Treatment Plant of 12.439 m3/ day capacity (41.000 Population Equivalent), treating carboneous content of sewage, All mechanical equipments and laboratory equipments supply, erection, start-up and training All electrical equipments and instrumentation supply, operation of PLC and SCADA and automatic control of plant, Aerated Grit and Oil Chamber, Aeration Basins (4.061 m3) Final Clarifiers Aerobic Sludge Stabilization System, Sludge Dewatering Building, Sludge Stock Area, Odour Removal System, Aeration Basin Blower Building, Operation Building, All Civil Works, Operation of plant for 90 days, Construction of İNKUMU Waste Water pre-treatment Plant of 2.283 m3/ day capacity (12.000 Population Equivalent), All mechanical equipments supply, erection, start-up and training for Pre- Treatment Plant, All electrical equipments and instrumentation supply, operation of PLC and SCADA and automatic control of Pre-Treatment Plant, Pre-Treatment Plant Odour Removal System, Pre-Treatment Plant All Civil Works, The Waste Water Collection Line Construction, Construction of Transfer Station for Pre-Treatment Plant Sea Outfall for Pre-Treatment Plant, Operation of Pre-Treatment plant for 90 days, Providing technical guiding and assistance for BARTIN Waste Water Treatment Plant and INKUMU Pre-Treatment Plant for 1 year period

FEDERAL MOGUL Piston and Pin Manufacturing Facilities A.Ş. Industrial Waste Water Treatment Plant and Process Rinsing Water Recovery Plants Date : 16.07.2014 Period : 15.01.2015 Manufacturing of Polypropylene Pre - Storage Tanks for high iron content, oily & concentrated Acid / Alcali wash waste water and rinse water, sourcing out from piston production phosphating processing, Separation of oil and waste water as treating oily waste Water through ultrafiltration system, Continuous Chemical Treatment System at 4,5 m³/h capacity for concentrated Acid / Alcali wash waste water, rinsing water and oil separated waste water, Advance Treatment by Multi Layer Filter and Activated Carbon Filter for chemically treated waste water, Supply of Chemical Storage and Dosing Systems for Waste Water Treatment Plant, Ion Exchange (Resin) Recovery Plant at 4 m³/h capacity to recover process rinsing Water, Full automation for Industrial Waste Water Treatment Plant and Ion Exchange (Resin) Recovery Plant by means of PLC and SCADA systems,

FABAL ALÜMİNYUM SAN. ve TİC. A.Ş. Acid Recovery Plant Date : 10.07.2014 Period : 10.12.2014 Manufacturing of Acid Recovery Plant which will selectively remove (8 kg / h) excess amount of aluminium in sulphuric acid, sourcing out from the process of aluminium anodic oxidation (eloxal process), as eventually recovering acid. Interconnecting piping between eloxal process tanks and Acid Recovery Plant, Full automation for Acid Recovery Plant by means of PLC and OPERATOR PANEL systems,

ASAŞ ALÜMİNYUM SAN. ve TİC. A.Ş. Flat Product Factory Waste Water Treatment Plant and Process Make Up & Softening Plant Date : 04.07.2013 Period : 30.09.2014 Manufacturing of Polypropylene / GRP Pre - Storage Tanks for oily Acid / Alkali wash and rinse water sourcing out from aluminium and galvanized Metal Processing Plant, Interconnecting piping between eloxal process tanks and Acid Recovery Plant, DAF and Continuous Chemical Treatment System at 25 m³/h capacity for Acid / Alcali wash and rinse water, Biological Treatment System at 30 m³/h capacity for Chemically Treated waste water and domestic waste water, Neutralization of chemical gas by means of gas washing unit (gas scrubber), Supply of Chemical Storage and Dosing Systems for Waste Water Treatment Plant, Pre-treatment for well water at 160 m3/ h capacity, including Multilayer Filter and chlorination, 110 m3/ h capacity Softening Resin System with 2x %100 configuration, Demineralisation Plant with Reverse Osmosis of 10 m3 / h permeat capacity, Supply of Chemicals Storage and Dosing System for Process Water Make Up Plant, Full automation for Process Water Make Up Plant and Waste Water Treatment Plant by means of PLC and SCADA systems,

AZERAQRARTIKINTI JOINT STOCK COMPANY GORANBOY Sewage Treatment Plant (3.500 m³/day) Date : 16.01.2013 Period : 30.08.2014 Domestic Biological Waste Water Treatment Plant, processing through advanced biological treatment method, at 3.500 m³/day capacity - (17.500 Population Equivalent) All mechanical equipment s and laboratory equipment s supply, erection, start-up, training and operation for 1 year, All electrical equipment s and instrumentation supply, operation of PLC and SCADA and automatic control of plant Aerated Grit and Oil Chamber BIO P Tanks Aluminium Sulphate Preparation and Dosing System Aeration Basins Final Clarifiers Pressurized Sand Filtration System Sludge Dewatering Building Sludge Stabilization System with Lime UV Disinfection System Aeration Basin Blower Building Operation Building

AZERAQRARTIKINTI JOINT STOCK COMPANY GÖYGÖL Sewage Treatment Plant (5.500 m³/day) Date : 16.01.2013 Period : 30.08.2014 Domestic Biological Waste Water Treatment Plant, processing through advanced biological treatment method, at 5.500 m³/day capacity - (27.500 Population Equivalent) All mechanical equipment s and laboratory equipment s supply, erection, start-up, training and operation for 1 year All electrical equipment s and instrumentation supply, operation of PLC and SCADA and automatic control of plant Aerated Grit and Oil Chamber BIO P Tanks Aluminium Sulphate Preparation and Dosing System Aeration Basins, Final Clarifiers Pressurized Sand Filtration System Sludge Dewatering Building Sludge Stabilization System with Lime UV Disinfection System Aeration Basin Blower Building Operation Building

FORD OTOMOTİV SANAYİ A.Ş. Kocaeli Kocaeli / Yeniköy Industrial Waste Water Treatment Plant Date : 05.10.2012 Period : 07.10.2013 Manufacturing of Polyethylene Storage Tanks for Acid / Alkali rinse water sourcing out from Dyeing Plant, Continuous Chemical Treatment System at 30 m³/h capacity for Acid / Alcali rinse water, Separation of oil from emulsified oily waste water by means of ceramic type ultrafiltration system, Continuous Chemical Treatment System and Biological Treatment System at 15 m³/h capacity for oily and paint waste water, Neutralization of chemical vapours by means of gas washing unit (gas scrubber), Supply of chemical storage and dosing systems, Full automation for treatment plant by means of PLC and SCADA systems

BOSCH SANAYİ VE TİCARET A.Ş. Bursa Oxsilane Treatment Unit, Chromium Treatment Unit and Turbo Separator for Oily Waste Waters Date : 01.10.2012 Period : 31.12.2012 Robert Bosch Bu2 Silane Treatment Unit 2 m³/charge - Batch Treatment Unit 2 m³/day - Filtration Unit - Chemicals Preparation and Dosing Units Robert Bosch Chromium Treatment Unit 6 m³/charge - Double-Walled PVDF Piping - PVDF&GRP Waste Water Storage and Treatment Unit - Sludge Dewatering Unit - Filtration and Final ph Control Unit - Chemicals Preparation and Dosing Units - Waste Gas Collection and Treatment Unit Robert Bosch Emulsified Oily Waste Waters Treatment Unit 1200 l/hour - - Oily Waste Pumping Station and Turbo Separator Unit

HIDROLOTUS MMC Azerbaycan MINGECEVIR Sewage Treatment Plant at 25.000 m³/day capacity Date : 01.11.2011 Period : 31.12.2014 Domestic Biological Waste Water Treatment Plant, processing through advanced biological treatment method, at 25.000 m3 / day capacity - (125.000 Population Equivalent) All mechanical equipments and laboratory equipments supply, erection, start-up and training All electrical equipments and instrumentation supply, operation of PLC and SCADA and automatic control of plant Aerated Grit and Oil Chamber BIO P Tanks Aeration Basins (48.000 m3) Final Clarifiers Sludge Dewatering Building Sludge Stock Area Disinfection Basin through chlorination Aeration Basin Blower Building Operation Building *Civil Works are excluded.

HIDROLOTUS MMC Azerbaycan LENKERAN Sewage Treatment Plant at 10.000 m³/day capacity Date : 01.11.2011 Period : 31.12.2014 Domestic Biological Waste Water Treatment Plant, processing through advanced biological treatment method, at 10.000 m3 / day capacity - (50.000 Population Equivalent) All mechanical equipments and laboratory equipments supply, erection, start-up and training All electrical equipments and instrumentation supply, operation of PLC and SCADA and automatic control of plant Aerated Grit and Oil Chamber BIO P Tanks Aeration Basins (23.000 m3) Final Clarifiers Sludge Dewatering Building Sludge Stock Area Disinfection Basin through chlorination Aeration Basin Blower Building Operation Building *Civil Works are excluded.

MINISTRY OF ENVIRONMENT and FOREST Manisa-Kula Hardness Removing Potable Water Treatment Plant Date : 13.05.2011 Period : 13.05.2012 Hardness Removing Potable Water Treatment Plant of 5.700 m3/ day capacity, through Ultrafiltration and Reverse Osmosis System Design and Project Execution, Supply of all the mechanical equipments and laboratory equipments, installation, commissioning, training and Operation of the Plant for 1 year Supply of Main Power Supply Lines and all electrical equipments and instruments, automation & control of the plant through PLC & SCADA and telemetry System Feeding Pumps Micro Filtration Ultrafiltration System UF Permeat Tank and CIP System Reverse Osmosis Feeding and High Pressure Pumps Reverse Osmosis System Chemicals Preparation, Storage and Dosing Systems Raw Water Storage Basin Administrative and Operation Building, Transformer and Generator Building All civil works Operation of the plant for 365 days

SYRIAN ARAB REPUBLIC Maret Masreen Wastewater Treatment Plant Date : 01.11.2010 Period : 01.12.2011 Domestic Biological Waste Water Treatment Plant, processing through advanced biological treatment method, at 6.629 m3/ day capacity (approximately 62.000Population Equivalent) All mechanical equipments laboratory equipments and spare parts supply, erection, start-up, operation (1 year) and training (1 year) All electrical equipments and instrumentation supply, operation of PLC and SCADA and automatic control of plant Maneuver Room Coarse Screen and Pumping Station Fine Screen and Blower Building Aerated Grit Chamber Flow Measurement Channel Anaerobic Basin Distribution Chamber Final Clarifiers Final Clarifier Effluent Collection Chamber Chlorine Contact Basin Sludge Recirculation Basin Scum Manhole FeSO4 Storage and Dosing Basin Service Water Storage Blower Building Transformer and Generator Building Operating Building Sludge Dewatering Building Watchmen Building Workshop and Storage Building Chlorination Building Empty Wash Water Basin Sludge Cake Storage Building Operation of plant for 12 months Training at plant for 12 months

ELEKTRİK ÜRETİM A.Ş. (EÜAŞ) Kütahya Tunçbilek Thermal Power Plant 3.- 4. and 5. Industrial Wastewater Treatment Plant Units Date : 01.11.2010 Period : 01.12.2011 Fly Ash Slurry Treatment Plant for slag tank overflow slurry, cooling tower overflow lines and flocculator slurry, at 335 m3/h capacity and pumping stations All mechanical equipments supply, erection, start-up and training All electrical equipments and instrumentation supply, operation of PLC and SCADA and automatic control of plant Pre Sedimentation Basins Clarifiers Thickener Service Water System Chemical Dosing Systems All Civil Works

ELEKTRİK ÜRETİM A.Ş. (EÜAŞ) Sivas Kangal Thermal Power Plant 1. and 2. Industrial Wastewater Treatment Plant Units Date : 01.11.2010 Period : 01.12.2011 Fly Ash Slurry Treatment Plant for slag tank overflow slurry, at 181 m3/h capacity. All mechanical equipments supply, erection, start-up and training All electrical equipments and instrumentation supply, operation of PLC and SCADA and automatic control of plant Pre-Sedimentation Basins Clarifiers Thickener Service Water System Chemical Dosing Systems All Civil Works

SYRIAN ARAB REPUBLIC Jableh Wastewater Treatment Plant Date : 09.02.2009 Period : 14 months Domestic Biological Waste Water Treatment Plant, processing through advanced biological treatment method, at 20.880 m3/ day capacity (approximately 120.000 Population Equivalent) All mechanical equipments laboratory equipments and spare parts supply, erection, start-up, operation (1 year) and training (1 year) All electrical equipments and instrumentation supply, operation of PLC and SCADA and automatic control of plant Maneuver Room Coarse Screen and Pumping Station Fine Screen and Blower Building Aerated Grit Chamber Flow Measurement Channel Anaerobic Basin Distribution Chamber Final Clarifiers Final Clarifier Effluent Collection Chamber Chlorine Contact Basin Sludge Recirculation Basin Scum Manhole FeSO4 Storage and Dosing Basin Service Water Storage Blower Building Transformer and Generator Building Operating Building Sludge Dewatering Building Watchmen Building Workshop and Storage Building Chlorination Building Empty Wash Water Basin Sludge Cake Storage Building Operation of plant for 12 months Training at plant for 12 months

GEBZE ORGANIZED INDUSTRIAL REGION ADMINISTRATION Gebze Organized Industrial Region Project of Construction and Operation of Waste Water Treatment Plant, Pumping Station and Lifting Pipe Line Date : 17.09.2009 Period : 15.03.2011 Construction of 6.400 m³/day capacity Industrial Waste Water Treatment Plant operating through Chemical and Advanced Biological Process, Pumping Station and Lifting Pipe Line and Operation for 5 Years Design and Project, Civil Construction, All mechanical equipments and Laboratory equipment Supply, Erection, Commissioning, Operation for 5 years and training All electrical equipments and instrumentation supply, operation of PLC and SCADA and automatic control of plant Pumping Station and Lifting Pipe Line Coarse and Fine Screens Aerated Grit and Oil Chamber Equalization Basin Coagulation, Flocculation and Chemical Sedimentation Basins BIO P Basins Aeration Basins Final Clarifiers Chemical and Biological Sludge Gravity Thickeners Sludge Dewatering and Chemical Storage & Dosing Building Sludge Drying System Building Aeration Basin Blower and Transformer Building Odour Removal Unit Operation Building All Civil Works Operation of Plant for 5 years

İZMİR SU VE KANALİZASYON İDARESİ GENEL MÜDÜRLÜĞÜ (İZSU) Kemalpaşa Waste Water Treatment Plant Construction İzmir Date : 17.06.2009 Period : 15.11.2010 Domestic Biological Waste Water Treatment Plant, processing through advanced biological treatment method, at 12.960 m3 / day capacity (50.000 Population Equivalent) All mechanical equipments and laboratory equipments supply, erection, start-up and training All electrical equipments and instrumentation supply, operation of PLC and SCADA and automatic control of plant Aerated Grit and Oil Chamber BIO P Tanks Aeration Basins (22.500 m3) Final Clarifiers Sludge Dewatering Building Sludge Stock Area Disinfection Basin through UV Aeration Basin Blower Building Operation Building All Civil Works Operation of plant for 180 days

BOSCH SANAYİ VE TİCARET A.Ş. Oil Recovery Plant Bursa Date : 19.08.2008 Period : 10 weeks Recovery of Cutting Oil sourced from Production Plants with Filtration process by separating particles. Manufacturing of Polypropylene storage tanks. Preparation of As-Built Projects Recovery of Cutting Oil sourced from Production Plants with Filtration process by separating particles. AKSARAY BELEDİYESİ Aksaray Drinking Water Treatment Plant, Turnkey Chemical Preparation and Dosing Plant Date : 09.10.2008 Period : 90 days

İSKENDERUN DEMİR VE ÇELİK A.Ş. İskenderun İsdemir Waste Reclamation Project, Building Convertor Sludge Dewatering And Drying System And Plants Date : 17.12.2007 Period : 20.01.2010 Wastewater flow 10.800 m 3 /day No of Sedimentation Basins 1 x 10.800 m 3 /day Sludge Dewatering Units 2 x 1560 m 3 /day Sludge Drying Unit 1 x 336 ton/day Briquetting Unit 1 x 336 ton/day Construction & infrastructure works Steel works Piping Tanks HVAC (Heating Ventilation & Air Conditioning) QA / QC Preparation of as-built drawings

ÇUHADAROĞLU METAL SANAYİ VE PAZ. (İstanbul) Acid Retardation Unit, (GOEMAPUR AL 1000), Water Softening Plant, Demineralization Plant, Waste Water Recovery Plant Date : 18.06.2007 Period : 13 weeks Acid Retardation Unit 9.600 g/h Water Softening Plant 25 m 3 /h Demineralization Plant 250 m 3 /day Waste Water Recovery Plant 10 m 3 /h

NİLÜFER ORGANİZE SANAYİ BÖLGESİ (Bursa) Common Industrial Wastewater Treatment Plant Date : 07.07.2006 Period : 09.10.2007 Physical and Chemical Treatment and Discharge to Çakal/Ayvalı Valley of 26 m3/h Continuous Wash Water, 4590 m3/month Concentrate Acid Alkali Wastewater, 450 m3/month Concentrate Oily Wastewater, 8 m3/month Cutting Wastewater which are collected from 61 of 202 industry exist in Nilüfer Organized Industrial Zone. Project Preparation for the transportation of wastewater transportation lines to pumping station, from pumping to treatment plant. Signalization to automation system with fiber optic and profibus cables of 70 pcs. flowmeter. Preparation of architectural, static, electric and installation projects of Treatment Plant and Pumping Stations. Preparation of As-Built Projects

İZMİR BÜYÜKŞEHİR BELEDİYESİ (İzmir) İZMİR SU VE KANALİZASYON İDARESİ GENEL MÜDÜRLÜĞÜ Çiğli Waste Water Treatment Plant Sludge Dewatering System Revision Date : 07.07.2006 Period : 450 days Sludge flow 14000 m3/day. Sludge solid content % 1.67 Solid content after dewatering % 20 No of decanters 7 Pump and decanter building Pipe gallery Lime feeding system Piling application Construction & infrastructure works Steel works Piping Tanks HVAC (Heating Ventilation & Air Conditioning) QA / QC Preparation of as-built drawings

ROBERT BOSCH Bursa Enjektör Fabrikası Bursa Industrial Wastewater Treatment Plant II. Part Capacity Increase Project Date : 12.10.2005 Period : 30.04.2006 Lamella Settling Unit having 60 m³/day flowrate Ultrafiltration Unit for Oily Wastewater having 10 m³/day capacity Final Neutralization Unit having 160 m³/day capacity Final Filtration Unit having 60 m³/day flowrate Chemical Preparation and Dosing Unit Chemical Sludge Dewatering Unit having 100 liter/charge capacity

Federal Mogul İzmit Piston İşletmesi İzmit Industrial wastewater Treatment Plant II. Part Capacity Increase Project Date : 28.09.2005 Period : 6 Months Chemical Wastewater Treatment Plant of Acid/Alkali Continuous Flow Wastewater having 240 m3/d flowrate. Ultrafiltration Plant of Oil wastewater having 13 m3/d flowrate Final Neutralization Unit having 450 m³/day capacity Domestic Wastewater Treatment Plant having 800 pop./day flowrate. Chemical Sludge Dewatering Unit having 500 liter/charge flowrate. Biological Sludge Dewatering Plant having 100 liter/charge flowrate.

İSKENDERUN DEMİR VE ÇELİK A.Ş. İskenderun Industrial wastewater Treatment Plant II. Part Capacity Increase Project Date : 13.07.2005 Period : 255 days Wastewater flow 14000 m 3 /day No of Sedimentation Basin 3 Pump building 1 Cooling Tower 1 Coagulant, Flocculant feeding system 1 Construction & infrastructure works Steel works Piping Tanks HVAC (Heating Ventilation & Air Conditioning) QA / QC Preparation of as-built drawings

SAMRA POWER PLANT Demineralized and Potable Water Treatment Plant Date : 21.04.2005 Period : 15.11.2005 Pressurized MLF Unit 2 x 42 m3 / h Pressurized GAC Units 2 x 42 m3 / h RO Unit 2 x 42 m3 / h Cation Exchanger Unit 2x 22 m3 /h Anion Exchanger Unit 2x 22 m3 /h Mixed bed Exchanger Unit 2x 22 m3 /h Chemical Storage and Dosing Unit QA / QC

TARIŞ TAT ALAŞEHIR RAKI FABRIKASI Anaerobic / Aerobic Wastewater Treatment Plant (Manisa) Date : 22.09.2004 Period : 8 Months Following the Physical Treatment of the Industrial Wastewater having 200 m3/day of flowrate, anaerobically treated wastewater, in the Reactor which has Special Media, Resistivity to Shock Loads, High Organic Load and Low Operational Cost and then Aerobic Treatment of the Wastewater in the Sequencing Batch Reactors. Physical and Biological (Aerobic) Treatment of the Domestic Wastewater having 15 m3/day of Flowrate. Stabilization of the Sludges Produced in the biological processes, aerobically and dewatering of those sludges with the Solid Wastes Resulting from the Physical Treatment Stages. Preparation of the As-Built Projects.

ALARKO-ALSİM (KAZAKİSTAN) Astana Airport Waste Water Treatment Plant Date : 12.03.2004 Period : 60 Days Prosses, Mechanical Design, Automation and Manufacturing Penstocks for surface scraper tank Surface Scrapers Surface water channels Hydro elevator Oil and water separation unit Car wash and Treatment Unit

CPA / BECHTEL / IRAK Bechtel Baghdad Kerkh Waste Water Treatment Plant Electro-Mechanıcal Equipment Supply And Installation Project Date : 07.04.2004 Period : 07.04.2005 Rehabilitation work of all electrical equipments at the site (motors, starters, indoor and outdoor lighting materials, power distribution and lighting panels etc.), supply of power and control cables and installation of these cables, testing of all damaged equipments and supply and installation of the new ones, if it is necessary (11kV switchgears and 1600 kva transformers, electrical actuators, level measurement transmitters.)

CPA / BECHTEL / IRAK Bechtel Baghdad Rustımıyah Waste Water Treatment Plant Electro-Mechanıcal Equıpment Supply And Installatıon Project Date : 07.04.2004 Period : 07.04.2005 Rehabilitation work of all electrical equipments at the site (motors, starters, indoor and outdoor lighting materials, power distribution and lighting panels etc.), supply of power and control cables and installation of these cables, testing of all damaged equipments and supply and installation of the new ones, if it is necessary (11kV switchgears and 1600 kva transformers, electrical actuators, level measurement transmitters..)

HABAŞ / ALİAĞA (İzmir) 240 MW Combined Natural Gas Cycle Power Plant - WTU Date : 03.12.2003 Period : 31.12.2002 Pre- Treatment System Reverse-Osmosis I. Unit Reverse-Osmosis II. Unit EDI Unit 2x90 m³/h 2x80 m³/h 2x68 m³/h 2x50 m³/h

SIEMENS / ENERJİSA ENERJİ ÜRETİM A.Ş. Deionized Water Plant Condensate Polishing (Adana) Date : 03.04.2001 Period : 31.12.2002 Pre Treatment Unit Reverse Osmosis Mix. Bed Unit / Mix. Be Condensate Polishing System Chemical Storage and Dosage System 2x70 m 3 / h 2x75 m 3 / h

SIEMENS / ENERJİSA ENERJİ ÜRETİM A.Ş. Deionized Water Plant with EDI System (Mersin) Date : 03.04.2001 Period : 31.12.2002 Pre Treatment Unit Softening Unit Reverse Osmosis Unit EDI Unit 23 m 3 / h 17 m 3 / h 15 m 3 / h

SIEMENS / ENERJİSA ENERJİ ÜRETİM A.Ş. Deionized Water Plant with EDI System (Çanakkale) Date : 03.04.2001 Period : 30.09.2004 Pre Treatment Unit Softening Unit Reverse Osmosis Unit EDI Unit 23 m 3 / h 17 m 3 / h 15 m 3 / h

TRACTEBEL / BELGIUM 770 MW COMBINED CYCLE POWER PLANT (Ankara) Water Intake Structure, Pre-Treatment Plant, Demineralized Water Plant and Condansate Polishing Date : 05.10.2001 Period : March 2003 (Project handed over) Water Intake Structure 1260 m3 / hr Pre Treatment Plant 1260 m3 / hr Demineralized Water Plant 2x16 m3 / hr Cooling Tower By-Pass Filtration Unit 500 m3 / hr Condensate Polishing Unit 230 m3 / hr Ultrafiltration Plant 2x25 m3 / hr Reverse Osmosis Unit 2x16 m3 / hr Chemical Storage and Dosing Unit HVAC (Heating Ventilation & Air Conditioning) QA / QC Fire Fighting Structure for Water Intake from the river Structure for Water Discharge to the river Water Pump House Sludge Dewatering Building Sludge Storage Building Reactors & Chemical Building Filtered Water Building Pipe Bridge Lime Silos Fuel Tanks Pipeline between pre-treatment unit & water intake (300m) Pipeline between pre-treatment unit & power plant (2500m) Cooling Tower discharge pipeline (3000m) Filling Application Construction & infrastructure works Steel Works HVAC (Heating Ventilation & Air Conditioning) QA / QC Preparation of as Preparation of built projects

FEDERAL MOGUL A.Ş. Waste Gas Treatment Plant (Sapanca) Date : 27.11.2000 Period : 27.02.2002 Automatic Acidic Waste Gas Treatment Plant 4.000 m3 / h

I. HAVA İKMAL BAKIM MRK. KOMUTANLIĞI (Eskişehir) Waste Gas Treatment Plant Date : 17.10.2000 Period : 17.12.2000 Waste Gas with automatic Cyanide Treatment Plant 20.000 m3 / h Waste Gas with automatic Acid Treatment Plant 20.000 m3 / h

KARSAN OTOMOTİV SANAYİ A.Ş. Waste Water Treatment Plant (Bursa) Date : 01.03.1999 Period : 30.08.1999 Project includes treatment and channel discharge of waste water sourced from factory, located in BURSA HASANAĞA Sanayi Bölgesi Automatic Continuous Treatment Plant 240 m3 / day Sequencing Batch Treatment Plant Emulsified Oil Treatment Plant Dyed Waste Water Treatment Plant Sludge Dewatering System Final Filtration System 720 m3 / day Chemical Storage and Preparation Plant Biological WWTP (2500 population Equivalence) 720 m3 / day

ARÇELİK A.Ş. Eskişehir Industrial Waste Water Treatment Plant 80 m3/h Domestic Waste Water Treatment Plant 3400 capita/day Date : 01.12.1999 Period : 11.11.2000 Project includes treatment and discharge of industrial and domestic waste water, sourced from the factory founded in Eskişehir Organized Industrial Zone. Automatic Continuous Treatment Plant 240 m3 / day Industrial Waste Water Treatment Plant- 80 m3/h Domestic Waste Water Treatment Plant 3400 capita/day All mechanical equipment and instrumentation supply, erection, start-up and training All electrical equipment and instrumentation supply, operation of PLC and PC (SIEMENS S5 105U) and automatic control of plant Chemical Treatment Oily Waste Water Treatment by Cracking System Biological Treatment by Active Sludge

FORD - OTOSAN Gölcük / Kocaeli Waste Water Treatment and Deionized Water Plant Date : 29.01.1999 Period : 08.12.2000 Automatic Continuous Treatment Plant 720 m3 / day Sequencing Batch Treatment Plant Oily Wastewater Treatment Plant Dyed Waste Water Treatment Plant Final Filtration System 1440 m3 / day Sludge Dewatering System Chemical Storage and Preparation Plant Chemical Gas Removal Plant Deionized Water Plant 1200 m3 / day Biological WWTP (5000 population Equivalence) 1440 m3 / day

FORD - OTOSAN (Gölcük / Kocaeli) Waste Water Treatment and Deionized Water Plant Date : 29.01.1999 Period : 08.12.2000 Automatic Continuous Treatment Plant 720 m3 / day Sequencing Batch Treatment Plant Oily Wastewater Treatment Plant Dyed Waste Water Treatment Plant Final Filtration System 1440 m3 / day Sludge Dewatering System Chemical Storage and Preparation Plant Chemical Gas Removal Plant Deionized Water Plant 1200 m3 / day Biological WWTP (5000 population Equivalence) 1440 m3 / day

TEKLAS A.Ş. Gebze / Kocaeli Processed Waste Water Treatment Plant Date : 14.04.1999 Period : 14.10.1999 Automatic Continuous Treatment Plant 240 m3 / day Chromium Waste Water Treatment Plant 24 m3 / day Chlorinated Waste Water Treatment Plant Oily Waste Water Treatment Plant Final Filtration System 360 m3 / day Sludge Dewatering System Chemical Storage and Preparation Plant Chemical Gas Removal Plant

ABB ELEKTRİK SANAYİİ A.Ş. Kartal / İstanbul Industrial Waste Water Treatment Plant 1.5 m3/day Biological Waste Water Treatment Plant 30 m3/day Date : 11.11.1999 Period : 08.06.2000 Project includes treatment and channel discharge of industrial and biological waste water, sourced from factory, located in KARTAL/İSTANBUL All mechanical equipment and instrumentation supply, erection, start-up and training All electrical equipment and instrumentation supply, operation of PLC and PC (SIEMENS S5 105U) and automatic control of plant Chemical Treatment Biological Treatment by active sludge

TAT KONSERVE SANAYİ A.Ş. Karacabey / Bursa Biological Waste Water Treatment Plant 22.500 m3/day Date : 01.05.1997 Period : 31.12.1998 22.500 m³/day, Biological Waste Water Treatment Plant with Extended Aeration Activated Sludge Processes and application projects All mechanical equipment and instrumentation supply, erection, start-up and training All electrical equipment and instrumentation supply, operation of PLC and PC (SIEMENS S5 105U) and automatic control of plant Homogenization Tank 590 m² Aeration + Galleries 1.364 m² Sedimentation Tank 1.368 m² Sludge Tank 150 m² Operation Building 559 m² Two years operation All civil works

FEDERAL MOGUL PİSTON. ÜRE. SAN. A.Ş. Waste Water Treatment Plant İzmit Date : 15.09.1997 Period : 31.03.1998 Continuous Waste Water Treatment Plant 240 m3 / day Emulsified Waste Water Treatment Plant

SAMKOÇAUTO SAN. A.Ş. Waste Water Treatment Plant Özbekistan Date : 03.02.1998 Period : 15.09.1998 Automatic Continuous Treatment Plant Sequencing Batch Treatment Plant Oily Waste Water Treatment Plant Selective Ion exchangers Final Neutralization System Sludge Separation System Chemical Storage and Preparation Plant Chemical Gas Washing Plant

TÜRK TRAKTÖR VE ZİRAAT MAK. A.Ş. Waste Water Treatment and Recovery Plant Ankara Date : 08.10.1997 Period : 15.03.1998 Automatic Process Washing Water Recovery Plant 48 m3 / day Automatic Continuous Treatment Plant 240 m3 / day Sequencing Batch Treatment Plant Emulsified Oils Treatment Plant (Evaporation) 2,4 m3 /day Sludge Separation System Chemicals Station

GOODYEAR LASTİKLERİ A.Ş. Reverse Osmosis Plant İzmit / Kocaeli Date : 15.02.1998 Period : 20.12.1998 Project includes the preparation of the process water that is needed by the factory, located in İZMİT KOCAELİ Reverse Osmosis Plant 360 m3 / day

ENERJİSA ENERJİ ÜRETİMİ A.Ş. Ultra Pure Water Treatment Plant Date : 10.06.1997 Period : 15.12.1997 İzmit Project includes preparation of the process water that is required by the factory, located in İZMİT KOCAELİ Complete Water Preparation Plant Pre-Filtration System Reverse Osmosis System Deionized Water Plant 1320 m3 / day Condensate Preparation Plant 1560 m3 / day Chemical Treatment Plant Chemical Storage and Preparation Unit Potable Water Preparation Plant 24 m3 / day

TÜRK ELEKTRİK END. A.Ş. Oily Waste Water Treatment Plant Eskişehir Date : 08.05.1997 Period : 30.10.1997 Project includes treatment with ultrafiltration system and discharge of oily waste water, sourced from the factory founded in ESKİŞEHİR. Emulsified Oily Waste Water Treatment Plant Ultrafiltration Plant

SIEMENS SİMKO TİC. VE SAN. A.Ş. Oily Waste Water Treatment Plant İstanbul Date : 08.05.1997 Period : 30.10.1997 Automatic Industrial Waste Water Treatment Plant 72 m3 / day

BOZKURT MENSUCAT SAN. A.Ş. Çerkezköy/Tekirdağ Biological Waste Water Treatment Plant 4500m³/day Chimney Gas Neutralization System Date : 21.08.1996 Period : 15.05.1997 Project includes biological treatment and discharge of waste water, sourced from the factory founded in Çerkezköy/Tekirdağ. Biological Waste Water Treatment Plant 4500 m³/day Chimney Gas Neutralization system Chemicals Station Sludge Dewatering Plant

TAT KONSERVE SAN. A.Ş. Yenişehir/Bursa Biological Waste Water Treatment Plant 15 000m³/day Date : 03.11.1995 Period : 15.03.1997 Project includes treatment of waste water sourced from factory, located in ANKARA, by biological treatment systems and channel discharge of it. Biological Waste Water Treatment Plant 15000 m³/day All mechanical equipment and instrumentation supply, erection, start-up and training Chemicals Station All electrical equipment and instrumentation supply, operation of PLC and PC (SIEMENS S5 105U) and automatic control of plant

OTOYOL A.Ş. IVECO Arifiye Tesisleri / Adapazarı Industrial Waste Water Treatment and Recovery Plant Date : 31.08.1995 Period : 12 months Automatic Processed Washing Water Recovery 240 m3 / day Automatic Continuous Treatment Plant 360 m3 / day Sequencing Batch Treatment Plant Oily Waste Water Treatment Plant Emulsified Oils Treatment Plant Chemical Storage and Preparation Plant Chemical Gas Washing Plant Sludge Dewatering System Biological Treatment Plant 360 m3 / day

SWEDISH MATCH KİB. VE ÇAKMAK A.Ş. Bursa Industrial Waste Water Treatment Plant 20 m3 / gün Date : 02.10.1995 Period : 7 months Project includes treatment and channel discharge of industrial waste water, sourced from the factory founded in İnegöl/Bursa Chemical Storage and Preparation Plant Biological Waste Water Treatment Plant Sequencing Batch Treatment Plant 20 m3 / day Sludge Dewatering System Chemicals Station

MERKO GIDA SAN. A.Ş. M.Kemalpaşa / Bursa Biological Waste Water Treatment Plant - 3120m3/day Date : 21.07.1995 Period : 31.06.1996 Project includes treatment and discharge of waste water, sourced from the factory founded in Bursa/Mustafa Kemal Paşa and also includes process for reusable well water Biological Waste Water Treatment Plant 3120 m3 / day Ammonia Removal Plant 50 m3/h All mechanical equipment and instrumentation supply, erection, start-up and training All electrical equipment and instrumentation supply, operation of PLC (SIEMENS S5 105U) and automatic control of plant

PASTAVİLLA KARTAL MAKARNACILIK Waste Water Treatment Plant Date : 15.03.1996 Period : 30.06.1996 İzmir Waste Water Treatment Plant 20 m3 / day

FREUHAUF A.Ş. - ARİFİYE TESİSLERİ Waste Water Treatment Plant Date : 15.03.1996 Period : 30.06.1996 Adapazarı Automatic Industrial Waste Water Treatment Plant 360 m3 / day Biological Waste Water Treatment Plant Sludge Separation System Chemical Storage and Preparation Plant

OLMUKSA IT.SABANCI AMB.SAN.TİC. İnegöl/Bursa Date : 31.10.1995 Period : 31.05.1996 Industrial Waste Water Treatment Plant Automatic Continuous Treatment Plant 240 m3 / day Sludge Dewatering Plant Chemical Storage and Preparation Plant

DÖKTAŞ DÖKÜMCÜLÜK SAN. A.Ş. Orhangazi/Bursa Domestic Waste Water Treatment Plant Date : 15.08.1995 Period : 31.12.1995 Domestic Waste Water Treatment Plant 240 m3 / day

TAT KONSERVE SAN. A.Ş. Balıkesir Biological Waste Water Treatment Plant - 4800m3/gün Date : 15.08.1995 Period : 31.12.1995 Project includes biological treatment and channel discharge of waste water, sourced from the factory, founded in BALIKESİR Biological Waste Water Treatment Plant 4.800 m3 / day All mechanical equipment and instrumentation supply, erection, start-up and training All electrical equipment and instrumentation supply, operation of PLC and PC (SIEMENS S5 105U) and automatic control of plant

ARÇELİK A.Ş. Çayırova Tesisleri / İstanbul Industrial Waste Water Treatment Plant 288 m³/day Recovery of Process wash water 240 m3 / day Date : 29.05.1995 Period : 31.12.1995 Project includes treatment and discharge of industrial waste water, sourced from the factory founded in Çayırova/İstanbul and also includes recovery of process wash water and re-usage Recovery of processed Wash Water 240 m3 / day Recovery of phosphate wash water 168 m3 / day Industrial Waste Water Treatment Plant 288 m3 / day Reverse Osmosis System Oily Waste Water Treatment Plant Chemical Storage and Preparation Plant Chemical Gas Washing Plant Sludge Dewatering System

ARÇELİK ÇOK AMAÇLI MOTOR İŞL. S.Çiftiği. / İstanbul Chemical and Biological Waste Water Treatment Plant Date : 16.12.1994 Period : 31.09.1995 Chemical and Biological Waste Water Treatment Plant 50 m3 / day

GARANTİ BALFOUR BEATY İNŞ. A.Ş. Domestic Waste Water Treatment Plant Zekeriyaköy / İstanbul Date : 27.08.1993 Period : 30.04.1994 Domestic Waste Water Treatment Plant 900 m3 / day

TAT KONSERVE SAN. A.Ş. M.Kemalpaşa/Bursa Biological Waste Water Treatment Plant - 22.500 m3 / day Date : 22.01.1993 Period : 01.12.1994 Project includes civil works of biological waste water treatment plant that is constructed for treatment of wastewater, sourced from factory, in MUSTAFAKEMALPAŞA BURSA Complete Waste Water Treatment Plant 22.500 m3 /day Process and application projects All mechanical equipment and instrumentation supply, erection start-up and training All electrical equipment and instrumentation supply, operation of PLC and PC (SIEMENS S5 105U) and automatic control of plant

TÜRK ELEKTRİK ENDÜSTRİ A.Ş. Ümraniye / İstanbul Industrial Waste Water Treatment Plant Domestic Waste Water treatment Plant Waste Water Recovery Plant Date : 16.12.1994 Period : 12.06.1995 Project includes treatment and channel discharge of industrial and domestic waste water, sourced from the factory founded in İstanbul / Ümraniye and also recovery process of waste water Industrial + Biological Waste Water Treatment Plant 50 m3/day Waste Water Recovery Plant - 2 m3/h All mechanical equipment and instrumentation supply, erection, start-up and training All electricity equipment and instrumentation supply, operation of PLC (SIEMENS S5 105U) and automatic control of plant

HYUNDAI ASSAN OTOMOTİV SAN. VE TİC. A.Ş. Water Softening Plant Deionized Water Plant Industrial Waste Water Treatment Plant İzmit Date : 04.03.1996 Period : 12 months Water Softening Plant 240 m3 / day Deionized Water Plant 240 m3 / day Continuous Treatment Plant 720 m3 / day Emulsified Waste Water Treatment Plant Chemicals Station Sludge Dewatering Plant

ARÇELİK BULAŞIK MAK. FAB. A.Ş. Automatic Continuous Treatment Plant Ankara Date : 14.04.1993 Period : 30.09.1993 Automatic Continuous Treatment Plant 240 m3 / day Sequencing Batch Treatment Plant Selective Ion exchangers 240 m3 / day Biological Waste Water Treatment Plant 120 m3 / day Sludge Dewatering System Chemicals Station

İZOCAM TARSUS CAM YÜNÜ ÜR. TES. Automatic Continuous Treatment Plant Tarsus Date : June.1993 Period : Sept.1993 Domestic Waste Water Treatment Plant 35 m3 / day

TOFAŞ TÜRK OTOMOBİL FABRİKASI A.Ş. Bursa Industrial Waste Water Treatment Plant - 70 m3/h Oily Waste Water Treatment Plant 60 m3/h Domestic Waste Water Treatment Plant 10.000cap/day Date : 20.11.1992 Period : 20.07.1993 Project includes treatment and channel discharge of industrial and domestic waste water, sourced from the factory founded in Bursa Industrial Waste Water Treatment Plant - 70 m3/h Oily Waste Water Treatment Plant 60 m3/h Domestic Waste Water Treatment Plant 10.000cap/day Automatic Continuous Treatment Plant 1680 m3 / day Emulsified Oils Treatment Plant 1440 m3 / day Biological Waste Water Treatment Plant 2.000 m3 / day Sludge Separation System Chemicals Station

BELDESAN A.Ş. GAZAL A.Ş. GOSB TESİSLERİ Biological Waste Water Treatment Plant Gebze - Kocaeli Date : 22.10.1992 Period : 22.06.1993 Project includes treatment of industrial and domestic waste water, sourced from the factory founded in Kocaeli / Gebze and recovery of process wash wastewater All mechanical equipment and instrumentation supply, erection, start-up and training All electrical equipment and instrumentation supply, operation of PLC (SIEMENS S5 105U) and automatic control of plant Automatic Processed Washing Water Recovery Plant 240 m3 / day Automatic Continuous Treatment Plant 240 m3 / day Biological Waste Water Treatment Plant 1250 m3 / day Sequencing Batch Treatment Plant Emulsified Oils Treatment Plant Sludge Separation System Chemicals Station

BOZKURT MENSUCAT SANAYİ A.Ş. Zeytinburnu/İstanbul Industrial Waste Water Treatment Plant 85 m3/h Date : 30.04.1992 Period : 7 months Project includes treatment and discharge of industrial waste water, sourced from the factory founded in İstanbul/Zeytinburnu Industrial Waste Water Treatment Plant 85 m3/h All mechanical equipment and instrumentation supply, erection, start-up and training All electrical equipment and instrumentation supply, operation of PLC (SIEMENS S5 105U) and automatic control of plant

MAKO ELEKTRİK SAN. VE TİC. A.Ş. Bursa Date : 22.04.1992 Period : 10 months Project includes treatment and channel discharge of industrial waste water sourced from factory, located in BURSA Organized Industrial Zone and recovery of process water Chemical Treatment Cracking System Waste Water Recovery by ion exchange Industrial Waste Water Treatment Plant 10 m 3 /h Waste Water Recovery Plant 20 m 3 /h Automatic Processed Washing Water Recovery Plant 480 m3 / day Automatic Continuous Treatment Plant 240 m3 / day Bor Oil Treatment System Sludge Separation System Chemicals Station

BEKO ELEKTRONİK SAN. A.Ş. B.Çekmece / İstanbul Industrial Waste Water Treatment Plant Domestic Waste Water Treatment Plant Date : 01.08.1991 Period : 01.04.1992 Project includes treatment and channel discharge of industrial and domestic waste water sourced from factory, located in İSTANBUL / BÜYÜKÇEKMECE Wash Water Recovery Plant 72 m3 / day Industrial Waste Water Treatment Plant 72 m3 / day Domestic Waste Water Treatment Plant 3.000cap/day All mechanical equipment and instrumentation supply, erection, start-up and training All electrical equipment and instrumentation supply, operation of PLC and PC (SIEMENS S5 105U) and automatic control of plant

ERBAKIR ELEKTROLİTİK BAKIR MAM. A.Ş. Denizli Industrial Waste Water Treatment Plant - 40 m3/day Automatic H2SO4 Recovery Plant 350 l/h Date : 1991 Period : 8 months Industrial Waste Water Treatment Plant 40 m3/day GOEMAPUR Me 300 Automatic H2SO4 Recovery Plant

BOSCH FREN DONANIM END. SAN.VE TİC. A.Ş. Bursa Date : 1990 Period : 6 months Project includes treatment and channel discharge of industrial waste water sourced from factory, located in BURSA Continuous Treatment Plant 192 m3 / day Sequencing Batch Treatment Plant Sludge Separation System

TÜRK ELEKTRİK ENDÜSTRİ A.Ş. Recovery Plant 10 m3/h Topkapı / İstanbul Date : 05.10.1990 Period : 7 months Project includes recovery and re-usage of waste water from process basin, sourced from factory, located in BURSA

TÜRK TRAKTÖR VE ZİRAAT MAKİNALARI A.Ş. Industrial Waste Water Treatment Plant Ankara Date : 05.04.1989 Period : 05.02.1990 Project includes treatment and channel discharge of industrial waste water sourced from factory, located in ANKARA. Automatic Continuous Treatment Plant 360 m3 / day Sequencing Batch Treatment Plant Dyed Waste Water Treatment System Bore Oil Treatment System Sludge Separation System Chemicals Station

ARÇELİK PİŞİRİCİ CİHAZLAR SAN. A.Ş. Bolu Industrial Waste Water Treatment Plant 50 m3/h Domestic Waste Water Treatment Plant 1250 cap./day Date : 06.12.1989 Period : 9 Months Project includes treatment and discharge of industrial and domestic waste water, sourced from the factory founded in Bolu Sedimentation of Metal Hydroxide Biological Treatment by Active Sludge

BELDEYAMA MOTORLU VAS.SAN.A.Ş. İstinye/İstanbul Industrial Waste Water Treatment Plant 408 m3 / day Date : 21.06.1988 Period : 21.03.1989 Project includes treatment and channel discharge of industrial and domestic waste water, sourced from the factory founded in İstanbul/İstinye. Automatic Industrial Waste Water Treatment Plant 408 m3 / day

ARÇELİK MOTOR POMPA İŞLT. A.Ş. Topkapı / İstanbul Date : 24.06.1987 Period : 24.12.1987 Automatic Industrial Waste Water Treatment Plant 408 m3 / day

ARÇELİK MOTOR POMPA İŞLT. A.Ş. Topkapı / İstanbul Date : 17.07.1987 Period : 17.03.1988 Project includes treatment and channel discharge of industrial and domestic waste water sourced from factory, located in BOZÖYÜK ESKİŞEHİR Automatic Industrial Waste Water Treatment Plant 600 m3/day Domestic Waste Water Treatment Plant 70 m3 / day

ARÇELİK MOTOR POMPA İŞLT. A.Ş. Topkapı / İstanbul Date : 24.06.1987 Period : 24.12.1987 Automatic Industrial Waste Water Treatment Plant 192 m3 / day

FEDERAL MOGUL Sapanca / Adapazarı Automatic Industrial Waste Water Treatment Plant 240 m3 / day Full Automatic Chromatic Acid Recovery Plant 24 m3 / day

KARSAN OTOMOTİV SAN. VE TİC. A.Ş. Bursa Automatic Industrial Waste Water Treatment Plant 72 m3 / day Domestic Waste Water Treatment Plant (Project)

TÜRK DEMİRDÖKÜM+SOBA+ARDEM FAB. Bolu Continuous Treatment Plant 24 m3 / day Sequencing Batch Treatment Plant Sludge Seperation System Chemicals Station Biological Treatment Plant

TÜSAŞ MOTOR SAN. A.Ş. Eskişehir Continuous Treatment Plant 48 m3 / day Sequencing Batch Treatment Plant Sludge Seperation System Bore Oil Treatment System