PDI and Sign off of Cri-PC Pre Install Serial No: Location: Date of Install: Commissioner: Customer: Site Requirements Air: Manual Section 2.4 Water: Manual Section 2.4 Power: Manual Section 2.6 Clean & dry - 5 bar min Cri-01 Clean & dry - 6.5 bar min Cri-04 Clean - pressure - 2.5 bar min Low / High & Stable ref manual - 3 Phase connection Test Oil: Manual Section 2.7 ISO4113 43 Litres as per 1.1 End user has confirmed units to test are available Injectors, clamp kit etc. Site Requirements: Ref 2.1 of manual Clean & level floor, well ventilated with adequate access and a stable power supply Not Comment Receipt of Machine: Responsibility of Machine delivered on time. Packing is undamaged. Travel paperwork correct. Machine, undamaged & in presentable / acceptable condition? Check Transit protection devices activated Drop N Tell. Check Transit protection devices activated Tip N Tell. If yes take photographs of device and inform Hartridge immediately. Visible signs of damage to any external panels. Check for any damage caused by kits / components packed in base. All paperwork correct & completed with correct manual supplied. Unpack Machine: Responsibility of All paperwork has the same corresponding Serial No as found on the serial plate of machine. Certificate of Conformity and Electrical Test Certificate supplied and signed by all appropriate managers. Yellow pass label present. This will be found on the main electrical isolator switch and will need to be removed to operate the switch. Note: if any of the above missing contact Hartridge immediately. Kits & accessories available in their boxes for Engineers to install Check all items present on All additional items supplied are Order Acknowledgement / clearly marked and in a clean and Packing List. undamaged condition. Customer Name: Signature: Date: Name: Signature: Date: CUS 071 Issue 1 PDI CRi 001. Issue 1. 20 Oct 11
PDI and Sign off of Cri-PC Install Serial No: Date of Install: Location: Commissioner: Customer: Installing the Test Stand Position on rubber feet supplied & level with spirit level as per 2.2 in final location. Ensure 1 clear meter around machine for access. Not Comment Computer Installation Install computer & all associated cables & leads as per 2.3 Install: Responsibility of Water & Air Connection 10mm bulkhead fittings for water & 1/4" thread for air as per 2.4 Route leak off pipes to container (motor& water tray Routed to back of machine as overflows) shown in Figure 2.3 MUST be Earthed before three or single phase connected. Wire three phase connection using ref:.6.1 and Fig 2.4 Electrical Connections Wire single phase connection using ref: 2.6.2 Set for the correct supply voltage using table Ref: 2.6.3. Test Oil Initial Power-up Fill machine with test oil 35 Litres to ISO 4113 specification. Ref figure 2.6 Check pressure of air supply control valve is 5.5 bar. Check metering & pump air regulator is set to 3 bar. Turn on isolator switch clockwise Apply 3 phase power and air supply to start test fluid pump Turn on computer Fit injectors ref: 4.3.3. Check rotation of CR pump motor, clockwise viewed from rear of machine. If direction of rotation incorrect follow procedures 2.8.10-12. If motor doesn't start follow procedures 2.8.13-17 When rotation is correct switch off isolator and close cabinet door. Customer Name: Signature: Date: Name: Signature: Date: CUS 071 Issue 1 PDI CRi 002. Issue 1. 20 Oct 11
PDI and Sign off of Cri-PC Commission Serial No: Location: Date of Install: Commissioner: Customer: Measure incoming power supply value, and change transformer tapping as necessary CRi-PC manual section 2.6.3 Smooth Operation of Clamp Check Machine Functionality Heat Exchanger Matrix (include leaks) Not Comment Commission: Responsibility of Complete Emergency stop test CRi-PC manual section 5.3.1 Complete Dump valve test CRi-PC manual section 5.3.2 During and after first run of machine check for leaks or discharges of any fluids. Complete Metering audit test 2, 3 and 4 in MAGMAH Water - Note where from Air - Note where from Test fluid - Note where from CRi-PC manual section 5.3.4. Test 3 not needed if 1 line. Complete Backleak audit test in MAGMAH CRi-PC manual section 5.3.5 Complete Backleak unit vacuum function test Run 4 / 1 injectors depending on model at Mid Load condition. Complete IRIS test to ensure rail pressure stability Train customer how to operate and use the machine If already installed. Customer is able and comfortable to run machine without supervision. This includes set-up, understanding operation of machine and its systems, Interpretation of results and calibration and maintenance requirements. Customer Name: Signature: Date: Name: Signature: Date: Comments: CUS 071 Issue 1 PDI CRi 003. Issue 1. 20 Oct 11
PDI and Sign off of Cri-PC Customer (Workshop) comments Serial No: Location: Date of Install: Commissioner: Customer: Please provide us with feedback relating to the experience of the installation & commissioning of your Hartridge equipment. Your comments are important to us to improve our service. Arrival of machine Pre install Install Commissioning Machine general Install Engineer General Name Sign Date Please return this page to Hartridge customer support support@hartridge.com fax to +44(0) 1280 825601 or post to Customer Support Manager The Hartridge Building Network 421 Raddclive Road Buckingham, MK18 4FD
CUS 071 Issue 1 +
PDI ve Onay Formu (Cri-PC) Müşteri (İşyeri) Yorumları Seri No: Şehir: Kurulum Tarihi: Kurulumu Yapan Teknisyen: Müşteri: Lütfen bu bölümde Hartridge ekipmanınızın kurulumu ve devreye alınması sırasındaki tecrübelerinizi bizimle paylaşınız. Hizmetimizi daha iyi hale getirmek için yorumlarınız bizim için önemlidir. Tezgahın Teslimatı Kurulum Öncesi Kurulum Devreye Alınma Tezgahın Genel Durumu Kurulumu Yapan Teknisyen Genel Name Sign Date Lütfen bu sayfayı Hartridge teknik destek bölümüne iletiniz support@hartridge.com fax to +44(0) 1280 825601 ya da Teknik Destek Müdürüne postalayınız. The Hartridge Building Network 421 Raddclive Road Buckingham, MK18 4FD
CUS 071 Issue 1 +
PDI ve Onay Formu (Cri-PC) Seri No: Şehir: Kurulum Tarihi: Kurulumu Yapan Teknisyen: Müşteri: Lütfen bu bölümde Hartridge ekipmanınızın kurulumu ve devreye alınması sırasındaki tecrübelerinizi bizimle paylaşınız. Hizmetimizi daha iyi hale getirmek için yorumlarınız bizim için önemlidir. Tezgahın Teslimatı Kurulum Öncesi Kurulum + Devreye Alınma Tezgahın Genel Durumu Kurulumu Yapan Teknisyen Genel Sign Date Lütfen bu sayfayı Hartridge teknik destek bölümüne iletiniz support@hartridge.com fax to +44(0) 1280 825601 ya da Teknik Destek Müdürüne postalayınız. The Hartridge Building Network 421 Raddclive Road Buckingham, MK18 4FD
CUS 071 Issue 1 +