ABBREVIATED RESETTLEMENT ACTION PLAN MELTEM ENERJİ ELEKTRİK ÜRETİM A.Ş. 4 x2,3 MW Total:9,2 MW

Benzer belgeler
ABBREVIATED RESETTLEMENT ACTION PLAN SOLENTEGRE ENERJİ YATIRIMLARI TİCARET A.Ş. SOLENTEGRE Enerji Yatırımları Ticaret A.Ş.

TECHNICAL WIND RESOURCE CAPACITY of TURKEY (1/2)

WATER AND IRRIGATION SECTOR IN TURKEY

THE DESIGN AND USE OF CONTINUOUS GNSS REFERENCE NETWORKS. by Özgür Avcı B.S., Istanbul Technical University, 2003

Inventory of LCPs in Turkey LCP Database explained and explored

ARAZİ TEMİN RAPORU MELTEM ENERJİ ELEKTRİK ÜRETİM A.Ş. EGE RES İzmir ili, Kemalpaşa ilçesindedir. MELTEM ENERJİ ELEKTRİK ÜRETİM A.Ş

KIRGIZ CUMHURİYETİ JEOLOJİ VE MADENCİLİK DEVLET AJANSI NIN ALMALYK LİNYİT KÖMÜR HAVZALARINA İŞLETME LİSANSININ VERİLMESİ İHALESİ HK BİLGİ NOTU

Quarterly Statistics by Banks, Employees and Branches in Banking System

Turkish Vessel Monitoring System. Turkish VMS

WEEK 11 CME323 NUMERIC ANALYSIS. Lect. Yasin ORTAKCI.

ISSN: Yıl /Year: 2017 Cilt(Sayı)/Vol.(Issue): 1(Özel) Sayfa/Page: Araştırma Makalesi Research Article

ENG ACADEMIC YEAR SPRING SEMESTER FRESHMAN PROGRAM EXEMPTION EXAM

YAPI ATÖLYESİ. make difference.. DESIGN & CONSTRUCTION ENGINEERING ARCHITECTURE CONTRACTING. Design & Construction

Republic of Turkey Ministry of Finance General Directorate of National Immovables Performance Agreement

AKTS Başvurumuz. Bologna Süreci Uzmanlarının Değerlendirmesi

Our İstanbul based Law Office provides professional legal services all over Turkey.

Islington da Pratisyen Hekimliğinizi ziyaret ettiğinizde bir tercüman istemek. Getting an interpreter when you visit your GP practice in Islington

INDIVIDUAL COURSE DESCRIPTION

HEARTS PROJESİ YAYGINLAŞTIRMA RAPORU

ALANYA HALK EĞİTİMİ MERKEZİ BAĞIMSIZ YAŞAM İÇİN YENİ YAKLAŞIMLAR ADLI GRUNDTVIG PROJEMİZ İN DÖNEM SONU BİLGİLENDİRME TOPLANTISI

CHANGE GUIDE BSP Turkey

BEYOBASI ENERJI URETIM A.S. OTLUCA HEPP, ANAMUR RIVER IN MERSIN PROVINCE REPORTING FORM FOR LAND ACQUISITION / SOCIAL IMPACTS OF PORTFOLIO PROJECTS

Yangın Güvenliği Kursları Eğitim Kayıt Formu

YEDİTEPE ÜNİVERSİTESİ MÜHENDİSLİK VE MİMARLIK FAKÜLTESİ

AKDENİZ ÜNİVERSİTESİ MÜHENDİSLİK FAKÜLTESİ ÇEVRE MÜHENDİSLİĞİ BÖLÜMÜ ÇEV181 TEKNİK İNGİLİZCE I

PRELIMINARY REPORT. 19/09/2012 KAHRAMANMARAŞ PAZARCIK EARTHQUAKE (SOUTHEAST TURKEY) Ml=5.1.

TOPLAM / TOTAL , ,01 16,80 DENGE (- AÇIK + FAZLA ) BALANCE

Dares Datça Rüzgar Enerji Santrali Sanayi ve Ticaret A.Ş Wind Energy Farm Project. Main Stakeholder Consultation Report

YEDİTEPE ÜNİVERSİTESİ MÜHENDİSLİK VE MİMARLIK FAKÜLTESİ

A UNIFIED APPROACH IN GPS ACCURACY DETERMINATION STUDIES

MURADIYE ELEKTRIK ÜRETIM A.Ş.

Ulaştırma ve Haberleşme Transportation and Communication

First Stage of an Automated Content-Based Citation Analysis Study: Detection of Citation Sentences

Yangın Güvenliği Kursları Eğitim Kayıt Formu

TDF s Experiences and Good Practices in Management of Forced Migration

Yüz Tanımaya Dayalı Uygulamalar. (Özet)

VERGİ GELİRLERİ / TAX REVENUES

TÜRKiYE'DEKi ÖZEL SAGLIK VE SPOR MERKEZLERiNDE ÇALIŞAN PERSONELiN

BAŞVURU ŞİFRE EDİNME EKRANI/APPLICATION PASSWORD ACQUISITION SCREEN

EFET. European Federation of Energy Traders

( ) ARASI KONUSUNU TÜRK TARİHİNDEN ALAN TİYATROLAR

LEARNING AGREEMENT FOR TRAINEESHIPS

Emphatic and Supportive Teachers Key to Quality and Efficiency in Education EMPAQT

Technical Assistance for Increasing Primary School Attendance Rate of Children

EFET. European Federation of Energy Traders. Annex 2a to the General Agreement Confirmation of Individual Contract. (Fixed Price) between.

T.C. AKÇAKOCA SCHOOL OF TOURISM AND HOTEL MANAGEMENT DUZCE UNIVERSITY TRAINING FILE

BİLİMSEL ARAŞTIRMA PROJESİ (BAP) BAŞVURU FORMU SCIENTIFIC RESEARCH PROJECT (SRP) APPLICATION FORM

Bilim ve Teknoloji Science and Technology

Determinants of Education-Job Mismatch among University Graduates

BİLİMSEL ARAŞTIRMA PROJESİ (BAP) BAŞVURU FORMU SCIENTIFIC RESEARCH PROJECT (SRP) APPLICATION FORM

PROJE FİŞLERİNDE BÜTÇE. Rıfat Ünal Sayman 15 Ocak 2010 Ankara.

BPR NİN ETKİLERİ. Selim ATAK Çevre Mühendisi Environmental Engineer

Was founded in 1967 by Narin Family ; active in industry since 1934 and currently one of the most prominent and established tourism groups in Turkey

Dares Datça Rüzgar Enerji Santrali Sanayi ve Ticaret A.Ş Dares Datça Wind Energy Farm Project. Initial Stakeholder Consultation Report

Grontmij Sürdürülebilir Mühendislik ve Tasarım... Övünç Birecik, Grontmij Türkiye

Çocuk bakımı için yardım

ORGANIC FARMING IN TURKEY

TRANSPORTATION ENVIRONMENTAL (TAŞIMA ÇEVRE RİSKİ SORU FORMU)

ÖRNEKTİR - SAMPLE. RCSummer Ön Kayıt Formu Örneği - Sample Pre-Registration Form

PRODUCT CATALOGUE ÜRÜN KATALOĞU

Akçakoca Belediyesi 2017 YILI MAVİ BAYRAK ÇEVRE EĞİTİM VE BİLİNÇLENDİRME ETKİNLİKLERİ DOSYASI

Student (Trainee) Evaluation [To be filled by the Supervisor] Öğrencinin (Stajyerin) Değerlendirilmesi [Stajyer Amiri tarafından doldurulacaktır]

-NEW OFFICE PROJECT AT ETİLER- OFFICES FOR LEASE

MİMARİ TASARIM 7 / ARCHITECTURAL DESIGN 7 (Diploma Projesi / Diploma Project) Öğrenim Yılı Bahar Yarıyılı / Academic Year Spring

HÜRRİYET GAZETESİ: DÖNEMİNİN YAYIN POLİTİKASI

BAŞVURU FORMU (APPLİCATION FORM)

INSPIRE CAPACITY BUILDING IN TURKEY

TKMP BİLEŞENLER / COMPONENTS

Cilt:7 Sayı: 1 Volume:7 Issue:1 ISSN: ISPARTA

INDEX. Hakkımızda / About Us Fabrika / Factory Ürünler / Products

D-Link DSL 500G için ayarları

INDIVIDUAL COURSE DESCRIPTION


HAZIRLAYANLAR: K. ALBAYRAK, E. CİĞEROĞLU, M. İ. GÖKLER

.. ÜNİVERSİTESİ UNIVERSITY ÖĞRENCİ NİHAİ RAPORU STUDENT FINAL REPORT

Teknoloji Servisleri; (Technology Services)

e-ledger Fields (e-defter Alanları)

Erasmus+ ICM Personel Hareketliliği Süreci Staff Mobility Procedures

Name of Project/System: The Scope of the Program/System:

PROFESSIONAL DEVELOPMENT POLICY OPTIONS

a, ı ı o, u u e, i i ö, ü ü

Emerging Europe Energy Summit ELECTRICITY GENERATION SECTOR IN TURKEY

TÜRKÇE ÖRNEK-1 KARAALİ KÖYÜ NÜN MONOGRAFYASI ÖZET

DOKUZ EYLUL UNIVERSITY FACULTY OF ENGINEERING OFFICE OF THE DEAN COURSE / MODULE / BLOCK DETAILS ACADEMIC YEAR / SEMESTER. Course Code: IND 4912

B a n. Quarterly Statistics by Banks, Employees and Branches in Banking System. Report Code: DE13 July 2018

KAMULAŞTIRMANIN PARSEL SAYISI VE ORTALAMA PARSEL BÜYÜKLÜĞÜNE ETKİSİ. Tahsin BOZTOPRAK. Devlet Su İşleri 12. Bölge Müdürlüğü, KAYSERİ

TÜRKİYE DE BİREYLERİN AVRUPA BİRLİĞİ ÜYELİĞİNE BAKIŞI Attitudes of Individuals towards European Union Membership in Turkey

THE IMPACT OF AUTONOMOUS LEARNING ON GRADUATE STUDENTS PROFICIENCY LEVEL IN FOREIGN LANGUAGE LEARNING ABSTRACT

Sustainable Rural Tourism

DOKUZ EYLUL UNIVERSITY FACULTY OF ENGINEERING OFFICE OF THE DEAN COURSE / MODULE / BLOCK DETAILS ACADEMIC YEAR / SEMESTER. Course Code: MMM 4027

YABANCI ARAŞTIRMACILAR İÇİN BİLİMSEL ARAŞTIRMA İZİN PROSEDÜRÜ

From the Sabiha Gokçen Airport to the Zubeydehanim Ogretmenevi, there are two means of transportation.

MENERJI ELEKTRIK ÜRETIM A.Ş. YÜCE HEPP, AKSU RIVER IN GIRESUN REPORTING FORM FOR LAND ACQUISITION / SOCIAL IMPACTS OF PORTFOLIO PROJECTS

Experiences with Self Consumption Projects

Bazı göçmenlerin, kendilerine Avustralya da yaşama vizeleri verilebilmesi için önce bir Assurance of Support (AoS) almaları gerekir.

BOĞAZİÇİ UNIVERSITY KANDİLLİ OBSERVATORY and EARTHQUAKE RESEARCH INSTITUTE GEOMAGNETISM LABORATORY

ARI ÜRÜNLERİ KATALOĞU

STAJ DEĞERLENDİRME FORMU (ÖĞRENCİ) Internship Evaluation Form (Student)

Quarterly Statistics by Banks, Employees and Branches in Banking

Producer Name ss: Narkonteks Tekstil Ihr. Ith. San Ve Tic A.S. Sti DBID: Audit Date: 13/06/2017 Audit ID: Audit Type: Full Audit

Transkript:

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 1. Information About Project Name &Location of Subproject Project Sponsor Project Cost Installed Generation Capacity Key Dates of Implementation Project Components& Land Requirements ABBREVIATED RESETTLEMENT ACTION PLAN MELTEM ENERJİ ELEKTRİK ÜRETİM A.Ş. EGE WPP is located in Kemalpaşa district of İzmir province. MELTEM ENERJİ ELEKTRİK ÜRETİM A.Ş. 17.470.000. EUR 4 x2,3 MW Total:9,2 MW SFG2594 V3 Totally 8.310,7 ha forest area was used by MELTEM ENERJİ ELEKTRİK ÜRETİM A.Ş. The delivery date of compensations paid for the lands which are used for the WPP is 2014. Access road, including improvements to existing roads (km&ha:): Transportation will be provided by existing roads and 6 km access road will be opened in addition. Transmission line corridor (km):6 km Temporary sites needed for equipment parks, laydown areas, etc: Site plan, including associated facilities: Can be found on attachment. 2.Inventory of Land & Assets Acquired from Private Owners (Completely Volunteer Purchased)(*) The information about the names of the land owners amount of total and acquired areas, existing structures on the land if any and purchasing purpose of the land is given on MELTEM ENERJİ Land Acquisition Table. The payments written on the Name of Owners/land user table was the rental fees for two years, paid for the pole areas. The compensations haven t been determined yet by TEDAŞ. The information on the payments and land owners will be given after the expropriation process is completed. Project Component: Area(s) / plots(s) acquired (ha) Owner s/user s total land holding (ha); % taken for project. Land use: pasture, agriculture, residence, etc. Inventory of any structures or other fixed or productive assets (wells, fences, trees, field crops, etc) affected.

Indicate if land was rented or informally used by another party. Indicate if nonowner users had assets, trees, crops, etc affected Indicate if landbased activity is primary source of income for owner or land user. Compensation paid. Dates delivered. Impact on income of owner. 2.1. Inventory of Land & Assets Acquired from Private Owners Name of Owners/land user Project Component: Area(s) / plots(s) acquired (ha) Owner s/user s total land holding (ha); % taken for project. Land use: pasture, agriculture, residence, etc. Inventory of any structures or other fixed or productive assets (wells, fences, trees, field crops, etc) affected. Indicate if land was rented or informally used by another party. Indicate if nonowner users had assets, trees, crops, etc affected Indicate if landbased activity is primary source of income for owner or land user. Compensation paid. Dates delivered. Impact on income of owner. 3.Inventory of Public, Community, or State Land Acquired Land parcels / plots acquired (ha). Forest area: 8.310,7 ha Total Area: 8.310,7 ha Details are given on Annex 34 on MELTEM ENERJİ ELEKTRİK ÜRETİM A.Ş. Land Acquisition Table. Land type / land use: Forest, commons for grazing, other. These lands are industrial forestry. Ownership: State, community, other. Treasury. Structures or other fixed assets.

Compensation, land transfer, or other measures to mitigate impacts on land users. Specify measures and dates of delivery. There aren t any structures or fixed assets for public use. 130.970,31 TL was paid in 2014 for the land permit fee. 4.Consultations,Communications & Management of Grievances and Implementation Issues General Information About Project and Project Area : Meltem Enerji Elektrik Üretim A.Ş. (Meltem Enerji) has plannned to develop and operate Ege Wind Farm (WF) in Kemalpaşa District of İzmir Province in Turkey. The project is located in 11 km southeast of Kemalpaşa District and at a distance of 30 km from İzmir Province. The closest settlement to the Project site is Çambel Village in north with a distance of 1600 m. Ege WF is located within forest area land owned by the Treasury. Meltem Enerji has secured an official letter numbered 87147206255.99/1050828 and dated May 20, 2015 from Kemalpaşa Forest SubDistrict of General Directorate of Forestry that the forest land within Kemalpaşa Forest SubDistrict boundaries is a planted and managed forest, and not a natural forest. There is no privatelyowned land situated on the Project site, also there are archaeological and historical resources within the proposed Project site. Consultations,Communications & Management of Grievances: The company organized a Stakeholder Consultation Meeting on 29.03.2012 at Pazaryeri Tea House, near Çambel Village, Kemalpaşa District, İzmir Province at 13:30. 18 external stakeholders (ministries, provincial directorates, NGOs and chambers) were invited to the meeting as well as villagers. Emphasize was given to the locals specifically from the nearby Çambel Village, which is the closest residential area. Female attendance was specifically emphasized and encouraged both by the Project Participant and the Muchtar of Çambel Village. Generally the preferred means for invitation was through emails. Most of the stakeholders were invited through emails and phone calls. However taking into account that reaching all of the locals through emails is not possible, village muchtar was asked to inform the locals and inform them about the project and the meeting (the hard copies of the nontechnical description of the project activity, questionnaire on sustainable development matrix and monitoring were also delivered to the locals on beforehand). The invitation text was also put up on several public locations of the village such as the teahouses, markets and mosques. The meeting date, time and place were defined by consulting to the village Muchtar to enable a high level of participation. Based on the feedback from Muchtar it was decided to organize the meeting at the central teahouse in the village The meeting was also announced at Yeni Asir Gazetesi local newspaper on 15.03.2012. Before the meeting the following documents have been provided to the stakeholders: + Nontechnical description of the project activity (also submitted along with the invitations); + Meeting evaluation forms; + Questionnaire regarding the sustainable development indicators and monitoring of the indicator (also submitted along with the invitations).

The participation to the meeting was high with over 40 participants. However the female participation was under the expectations and therefore the project representatives conducted one on one interviews with the females of the village, who were willing to provide input. In total 40 people filled the participation list with 31 male and 9 females. The majority of the participation is locals from Çambel Village. The actual participation was observed to be higher since some of the participants were reluctant to fill the participation list. The meeting started with introduction of the representatives of the Project Participant Ms. Sila Kılıç, explaining the aim of the meeting. Also a brief explanation was made with regards to the documents provided before the start of the meeting. The introduction followed by the explanation of the project activity done by Ms. Sezen Fidan, followed by a question and answer session. The blind assessment was conducted parallel to the Q&A session. There were no concerns on the impact of the proposed project activity to sustainable development and environmental. Also the continuous input mechanism was explained to the participants. It was decided that the muchtar will be the easiest way to communicate throughout the crediting period. The feedbacks provided by the stakeholders could be summarized as follows: The stakeholders are in favor of the project activity mostly due to the fact that it is a renewable energy source and would not lead to any emissions. The project activity includes the installation of four wind turbines. Actually the number of turbines were considered to be low in quantity by the locals since it has been the common belief that the area provides a greater potential to even support higher capacities. The locals are expecting the project activity will create an employment opportunity to the village. The locals are expecting also investments to be done directly to the village. These expectations vary within a wide range from building a wedding hall to providing directly electricity from the wind turbines to the village for free. In addition to the comments and requests communicated through the forms filled by the stakeholders, Mr. Ahmet Taşan, the Muchtar of the Çambel Village has also provided a written form that summarized the local s positive thoughts on the expected impact of the project activity as well as the needs of the village and the requests from the project owners. The company has provided a notebook at Çambel village Mukhtar s office for the grievances. There has been no grievances reported until now.

NOTLAR (NOTES): ANNEX 1: MELTEM ENERJİ ELEKTRİK ÜRETİM A.Ş. Satın Alınan Arazi Listesi ( Voluntary Purchased Land List) S.NO Sahibi (Owner) Ada (Island) Parsel (Parcel) Y.Ölçümü (Area) m 2 Satın Alınan (Purchased)m 2 Kalan (Remainig) m 2 Proje İçin Alınan (%) (Taken for Project) Birim Fiyat (Unit Price) TL Toplam Fiyat (Total Price) TL Ödeme Tarihi (Dates Delivered) Taşınmazın Cinsi (Type of Land) Satın Alma Nedeni (Exp. Reason) Arazide Bulanan Yapı (Structure on Land) 1 2 3 4 5 6 7 8 9

S.NO 1st and 2nd CIVIL COURT OF FIRST SENTENCE (Court) Sahibi (Owner) Ada (Island) Parsel (Parcel) Y.Ölçümü (Area) m 2 an (Expropriate d)m 2 ANNEX 2: MELTEM ENERJİ ELEKTRİK ÜRETİM A.Ş. Kamulaştırılacak Arazi Listesi (Expropriated Land List) NOT: Kalan (Remainig) m 2 Proje İçin Alınan (%) (Taken for Project) Birim Fiyat (Unit Price) TL Toplam Fiyat (Total Price) TL Ödeme Tarihi Taşınmazın Cinsi (Type of (Dates Delivered) Land) Kam. Nedeni (Exp. Reason) Arazide Bulanan Yapı (Structure on Land) NURİYE GAGA ALİ RIZA BİCAN MEHMET AZMİ BİCAN 1 0 1039 2,200.00 898.91 1,301.09 40 OLIVE VİNEYARD POWER TRANSMISSION LINE SÜNDÜZ BİCAN İSA BİCAN FATMA BİCAN 2 ALİF BORA 0 2114 13,960.17 9.22 13,950.95 1.00 OLIVE FARM POWER TRANSMISSION LINE 3 ŞEVKİ GAGA ZEYNEP ŞEVİK RAMAZAN KOÇ AHMET YAŞAR ÜSTÜNDAĞ AYSEL AKSOY HAMZA GAGA 0 1040 25780 3422.19 22357.81 13 12,700.00 30.06.2015 OLIVE VİNEYARD POLE AND POWER TRANSMISSION LINE HATİCE ÜTÜNDAĞ FATMA GAGA AYŞE AKGÜN CEVDET GAGA ZAFER GAGA 4 MEHMET AKSOY 0 1043 7,740.00 794.96 6,945.04 10.00 OLIVE VİNEYARD POWER TRANSMISSION LINE 5 HÜSEYİN KOÇ 0 1044 4,120.00 732.69 3,387.31 18.00 VINEYARD POWER TRANSMISSION LINE 6 HATİCE DEMİR HÜSAMETTİN EFE MAKBULE AKKAŞ 0 1046 4760 1.36 4758.64 1 FIELD POWER TRANSMISSION LINE TAHSİN EFE AHMET EFE HALİL İBRAHİM EFE 7 GÜLSÜM AKSOY 0 1045 11,500.00 1,595.75 9,904.25 14.00 FIELD POWER TRANSMISSION LINE 8 MUSTAFA İNCE 0 1047 7560 196.93 7363.07 3 OLIVE VİNEYARD POWER TRANSMISSION LINE MUAMMER İNCE 9 MUSA SAĞLAMYÜREK 0 1050 5,200.00 918.68 4,281.32 18.00 16,600.00 02.07.2015 OLIVE FARM POLE AND POWER TRANSMISSION LINE 10 MUSA SAĞLAMYÜREK 0 1051 10,300.00 325.84 9,974.16 3.00 OLIVE FARM POWER TRANSMISSION LINE 11 REZAN DUMAN 0 1055 7,280.00 616.12 6,663.88 8.00 OLIVE FARM POWER TRANSMISSION LINE 12 ESMA ÖZTÜRKMEN 0 1049 2,400.00 291.91 2,108.09 12.00 FIELD POWER TRANSMISSION LINE 13 CENNET ÖZEL 0 1062 1,040.00 308.35 731.65 30.00 VINEYARD POWER TRANSMISSION LINE 14 ESMA EREN 0 1063 880.00 454.30 425.70 52.00 VINEYARD POWER TRANSMISSION LINE 15 ELİF BORA CENNET ÖZEL ALİ BORA FETHİ BORA MUSTAFA REMZİ BORA 0 1065 484 56.64 427.36 12 FIELD POWER TRANSMISSION LINE 16 AHMET BORA İSMAİL BORA KEMALETTİN BORA ŞEYHAN BİCAN KEZİBAN ÇÜRÜK AHMET BORA MUSTAFA REMZİ BORA FETHİ BORA CENNET ÖZEL RAHMİYE BORA ABDÜLBAKİ BORA RABİE KARAGÖZ ASİYE EFE OSMAN ZİNNUR CEYLAN BİLAL CEYLAN FATMA ÖNAL ELİF İNCE 0 2025 4377.23 1158.98 3218.25 26 6,000.00 30.06.2015 FIELD POLE AND POWER TRANSMISSION LINE AYSEL USUL İSA İNCE AYŞE İNCE MEHMET ATAMAZ MUKADDER AYDOĞAN ESMA BORA MUKADDES ÖZKAN FATMA ACAR AYŞE ATAMAZ ÖZGÜR ATAMAZ HATİCE ATAMAZ ŞEYHAN BİCAN HESNA EVİRGEN

17 MAKBULE TAŞAN 0 1971 7506.14 54.26 7451.88 1 OLIVE VİNEYARD POWER TRANSMISSION LINE 18 19 MEHMET ALİ CENGİZ FATMA ÖNAL ELİF İNCE AYSEL USUL İSA İNCE AYŞE İNCE AYŞE ATAMAZ MALİYE HAZİNESİ (1074/1120) RAHMİYE BORA ABDÜLBAKİ BORA RABİE KARAGÖZ ASİYE EFE OSMAN ZİNNUR CEYLAN BİLAL CEYLAN 0 0 2024 2022 772.62 1200.15 104.63 75.5 667.99 1124.65 13 6 RAİLWAY RAİLWAY POWER TRANSMISSION LINE POWER TRANSMISSION LINE 20 FATMA ÖNAL ELİF İNCE AYSEL KOÇAK İSA İNCE AYŞE İNCE MALİYE HAZİNESİ (960/1120) HATİCE ŞEVİK FETHİ ŞEVİK MEHMET ALİ ŞEVİK NERİMAN BORA AYŞE BURHAN 0 1915 2069.88 227.01 1842.87 11 4,600.00 30.06.2015 FIELD POLE AND POWER TRANSMISSION LINE ALİ BORA EMİNE OLUKBEL NAZİFE ÖZEL AYSEL BORA 21 İSA YAVUZ 0 1876 3,782.49 589.36 3,193.13 16.00 FIELD POWER TRANSMISSION LINE 22 DÖNE UYDAŞ 0 1089 8,100.00 1,116.54 6,983.46 14.00 VİNEYARD POWER TRANSMISSION LINE 23 ÜMMÜ DEMİR 0 1939 15767.82 1796.14 13971.68 11 FIELD POWER TRANSMISSION LINE HATİCE YAMAN 24 HAFİZE ATİK 0 1093 7,500.00 1,462.42 6,037.58 19.00 FIELD POWER TRANSMISSION LINE 25 ALİ RIZA TÖREN 0 1231 15,900.00 581.46 15,318.54 4.00 FIELD POWER TRANSMISSION LINE 26 AYŞE ÖZEN 0 1094 9,200.00 554.50 8,645.50 6.00 FIELD POWER TRANSMISSION LINE 27 HAFİZE ATİK 0 1233 3,700.00 546.15 3,153.85 15.00 4,000.00 01.07.2015 FIELD POLE AND POWER TRANSMISSION LINE 28 FATMA AKIN 0 1229 12,700.00 510.83 12,189.17 4.00 OLIVE VİNEYARD POLE AND POWER TRANSMISSION LINE 29 ZAYİDE ÖZKAN HATİCE MULLA AYDOĞAN ADİLE YAVUZ 0 1228 15150 437.64 14712.36 29 OLIVE VİNEYARD POWER TRANSMISSION LINE 30 RAZİYE GÜNER ZAHİDE ÖZKAN MUSTAFA ALİ AKSOY GÖKSEL AKSOY 0 1099 54500 2648.23 51851.77 5 OLIVE VİNEYARD POLE AND POWER TRANSMISSION LINE BURAK ERKOÇ BURAK ERKOÇ 31 EMİNE TÖREN 0 1101 60,100.00 5,768.37 54,331.63 10.00 VİNEYARD POWER TRANSMISSION LINE 32 NEJDET POLAT 0 1127 19,250.00 3,927.10 15,322.90 20.00 VİNEYARD POLE AND POWER TRANSMISSION LINE 33 ABDULAZİZ AKTAŞ 0 1579 19,576.00 4,650.83 14,925.17 24.00 250.00 02.07.2015 VİNEYARD POLE AND POWER TRANSMISSION LINE 34 ELİF ÖZDEMİR İSA ÖZDEMİR İSMAİL ÖZDEMİR HASAN ÖZDEMİR AHMET ÖZDEMİR MUSTAFA ÖZDEMİR 0 1664 6371 56.36 6314.64 1 12,000.00 01.07.2015 VİNEYARD POLE AND POWER TRANSMISSION LINE 35 YUSUF ÖZDEMİR HATİCE BÜYÜKSAVRAN HASAN BÜYÜKSAVRAN FATMA BÜYÜKSAVRAN MEHMET BÜYÜKSAVRAN İSA BÜYÜKSAVRAN FATMA BURAN İSA BURAN 0 7928 604 2.43 601.57 1 FIELD POWER TRANSMISSION LINE İSMAİL BURAN TAHİR BURAN 36 AYŞE GEDİZ 0 7912 12,619.00 9,140.53 3,478.47 72.00 6,500.00 30.06.2015 FIELD POLE AND POWER TRANSMISSION LINE 37 HİDAYET ASLANOĞLU 0 142 8,000.00 57.09 7,942.91 1.00 3,500.00 05.07.2015 VİNEYARD POLE AND POWER TRANSMISSION LINE 38 SERKAN YÜZEÇ 0 143 3,500.00 283.81 3,216.19 8.00 4,000.00 10.07.2015 VİNEYARD POLE AND POWER TRANSMISSION LINE 39 MANSURE UĞURLU 0 144 3,700.00 330.02 3,369.98 9.00 FIELD POWER TRANSMISSION LINE 40 AYŞE GEDİZ 0 7730 21,303.00 270.12 21,032.88 1.00 VİNEYARD AND FİELD POWER TRANSMISSION LINE 41 MANSURE UĞURLU 0 145 7000 1019.62 5980.38 14 VİNEYARD POWER TRANSMISSION LINE EMİNE GEDİZ 42 AYŞE BETÜL ALAHMADİ 0 146 1,450.00 684.00 766.00 47.00 6,600.00 05.07.2015 VİNEYARD POLE AND POWER TRANSMISSION LINE BİLGİN TOGAY

43 İMREN TOGAY 0 1487 6800 1497.56 5302.44 22 29,000.00 08.04.2016 VİNEYARD POLE AND POWER TRANSMISSION LINE ALİ TOGAY TOTAL 437,703.50 50,175 Avarage (%) 11.00

S.NO.A.Ş. Kamulaştırılacak Yapıların Listesi (Expropriated Structure List). İLİ (City)..İlçesi (District)...Köyü (Village).. Mahkemesi(Court) ESAS (Base) NO: NOT: Sahibi (Owner) Ada (Island) Parsel (Parcel) Y.Ölçümü (Area) m 2 Kamulaştırılan (Expropriated)m 2 Kalan (Remainig) m 2 Birim Fiyat (Unit Price) TL Toplam Fiyat (Total Price) TL Yapının Cinsi (Type of Structure) Kam. Nedeni (Exp. Reason) NOTLAR (Notes)

MELTEM ENERJİ ELEKTRİK ÜRETİM A.Ş. Orman Arazisi Listesi Forestry Land List) İZMİR İLİ (City) Kemalpaşa İlçesi (District) S.NO Orman Bölge Müdürlüğü (Forestry Regional Office) Orman İşletme Müdürlüğü (Forest Management Directorate) Bölme Numaraları (Num. Of Divisions) İzin Alanı (Permitted Area) m 2 İzin Süresi (Permission Duration) İzin Bitiş Tarihi (Permission Ending Date) Teminat (Guarantee Amount) TL 1 İZMİR İZMİRMANİSA Kemalpaşa 124,126,127,128 Manisa 212,213,215 83,107.00 46 YIL 12/20/2060 11,200.00 Diğer Ödemeler (Other Payments) TL 19.650 TL Land Permit Fee for 2014, 304.714 TL Reforestation fee was paid in 2014

MELTEM ENERJİ ELEKTRİK ÜRETİM A.Ş.Hazine Arazi Listesi Treasury Land List) İZMİR İLİ (City).. Köyü (Village) Yeri (Region) Y.Ölçümü (Area) m 2 Varsa Kiralama Bedeli (rental fee,if any) TL Süresi Yıl (Duration Year) NOTLAR (Notes)