Kuruluşun Adı / Name of Organisation: Onay Referansı / Approval Reference: Form 13 Referansı / Form 13 Reference: Bölüm 1 Genel / Part 1: General

Benzer belgeler
UÇAK KOLTUK ÜRETİMİ AŞ

TÜRK AKREDİTASYON KURUMU

97/23/AT BASINÇLI EKİPMANLAR YÖNETMELİĞİ BAŞVURU BİLGİ FORMU INFORMATION FORM FOR 97/23/EC PRESSURE EQUIPMENT DIRECTIVE

LEARNING AGREEMENT FOR TRAINEESHIPS

PERSONEL BELGELENDİRME BAŞVURU FORMU/ PERSONNEL CERTIFICATION APPLICATION FORM SERTLEHİM / BRAZING

TÜRK AKREDİTASYON KURUMU

TRANSPORTATION ENVIRONMENTAL (TAŞIMA ÇEVRE RİSKİ SORU FORMU)

Onaylı Bakım Kuruluşları Yönetmeliği (SHY-145)

SHY-M DENETİMİ KONTROL FORMU

CHANGE GUIDE BSP Turkey

UYGUNLUK DEĞERLENDİRME BAŞVURU FORMU Application Form for Conformity Assessment

ONAYLI TEDARİKÇİ KURULUŞLARI TALİMATI (SHT TEDARİK) BİRİNCİ BÖLÜM Amaç, Kapsam, Dayanak ve Tanımlar

INFORMATION SECURITY POLICY

EYS-ORT-11-P32 AUDIT COMMITTEE CHARTER Revision Date: 25/11/2010. Page: 1 / 8

SİRKÜLASYON POMPALARI

ISO 9001:2015 Dokümande edilmesi zorunlu olan gereksinimler

CHANGE GUIDE BSP Turkey

Sivil Havacılık Genel Müdürlüğü nden: ONAYLI ÜRETİM KURULUŞLARI TALİMATI (SHT 21.Ü) BİRİNCİ BÖLÜM Amaç, Kapsam, Hukuki Dayanak ve Tanımlar

BELGELENDİRME MERKEZİ BAŞKANLIĞI YENİ KÜRESEL ESKİ YAKLAŞIM YÖNETMELİKLERİ UYGUNLUK DEĞERLENDİRME BAŞVURU FORMU

LOGO USING INSTRUCTION

ONAYLI TASARIM KURULUŞLARI TALİMATI (SHT 21.T) BİRİNCİ BÖLÜM Amaç, Kapsam, Hukuki Dayanak ve Tanımlar

EN STANDARDINA GÖRE DEMİRYOLU ARAÇLARI VE BİLEŞENLERİ İMALATÇILARININ BELGELENDİRİLMESİ BAŞVURU FORMU

GLOBALGAP V3.1 güncelleme Aralık 2009

DIŞ UZMAN BAŞVURU FORMU EXTERNAL EXPERT FORM

S.Q.CL.004/ /R0 Page 1 of 9

Grundtvig Programı 2012 Öğrenme Ortaklıkları Ara Dönem Toplantısı. 17 Haziran Ankara

DECLARATION OF PERFORMANCE No CPD-1958 REV 1.02

VERİCERT ISO 14001:2015 ÇEVRE YÖNETİM SİSTEMİ VERSİYON GEÇİŞ REHBERİ


Emphatic and Supportive Teachers Key to Quality and Efficiency in Education EMPAQT

YEDİTEPE ÜNİVERSİTESİ MÜHENDİSLİK VE MİMARLIK FAKÜLTESİ

Inspection Report Muayene Raporu KARE MÜHENDİSLİK ÇEVRE TEKNOLOJİLERİ SAN. TİC. A.Ş. SOLAR WATER HUMANITARIAN PROJECT

DOKÜMANTASYON MÜDÜRLÜĞÜ ORYANTASYON EĞİTİM KİTABI

AKTS Başvurumuz. Bologna Süreci Uzmanlarının Değerlendirmesi

certificates sertifikalar 2015 Fiyat Listesi-Price List DIN EN ISO 9001:2008 Zertifikat " UHE Kurucu Üyesidir."

İSTANBUL ŞEHİR ÜNİVERSİTESİ MÜHENDİSLİK ve DOĞA BİLİMLERİ FAKÜLTESİ STAJ YÖNERGESİ

Inventory of LCPs in Turkey LCP Database explained and explored

Numune Kodu ve parti no

STANDBY LETTER OF CREDİT (SBLC) ABDURRAHMAN ÖZALP

certificates sertifikalar 2015 Fiyat Listesi-Price List DIN EN ISO 9001:2008 Zertifikat " UHE Kurucu Üyesidir."

YAZILIM TEST VE BELGELENDİRME DAİRESİ BAŞKANLIĞI DIŞ UZMAN BAŞVURU FORMU EXTERNAL EXPERT FORM

İş Verilerini Değiştirme Formu Turkey

A5 INFORMATION SECURITY POLICIES Bilgi güvenliği politikaları

1. FİRMA BİLGİLERİ / COMPANY INFORMATION. Firma Adı Company Name. Firma Adresi Company Address. Telefon / Fax / Phone / Fax /

econn (Supplier Portal) of the MANN+HUMMEL Group

Uluslararası Tanınırlık için Kalite Yönetim Sistemlerinin Rolü. Dr. Enver SADIKOĞLU

YEDİTEPE ÜNİVERSİTESİ MÜHENDİSLİK VE MİMARLIK FAKÜLTESİ

HAVACILIK BAKIM YÖNETİMİ

Kurumsallaşmada, İç Denetim, Denetim Komitesi İlişkisi Nasıl Olmalıdır?

THY Teknik EASA DOA Tecrübesi ve POA Başvurusu

DİPLOMA EKİ ETİKET BAŞVURUSU: DEĞERLENDİRME 8 TEMMUZ 2013, ULUSAL AJANS / ANKARA. Prof. Dr. Süheyda ATALAY

ISO 9001:2015 STANDARDINDA YAPILMASI BEKLENEN DEĞİŞİKLİKLERE KISA BİR BAKIŞ

University (Yüksek Lisans) Selcuk University 75 / Mechanical Engineering Faculty, Mechanical Engineering

İSTANBUL KEMERBURGAZ ÜNİVERSİTESİ

YEDİTEPE ÜNİVERSİTESİ MÜHENDİSLİK VE MİMARLIK FAKÜLTESİ

Güneydoğu Havacılık İşletmesi A.Ş. Safety Performance Indicators (SPI)

ÜRÜN BELGELENDİRME BÖLÜMÜ BAŞVURU FORMU

BİLİŞİM TEKNOLOJİLERİ TEST VE BELGELENDİRME DAİRESİ BAŞKANLIĞI ORTAK KRİTERLER BELGELENDİRME SİSTEMİ / COMMON CRITERIA CERTIFICATION SYSTEM

Immigration Studying. Studying - University. Stating that you want to enroll. Stating that you want to apply for a course.

INTEGRATED MANAGEMENT SYSTEM Unit Code KP-14 QUALITY SYSTEM MANAGEMENT PROCESS IDENTIFICATION AND TRACEABILITY PROCEDURE

APPLICATION FORM FOR TEMPORARY CERTIFICATE OF ACTIVITY GEÇİCİ FAALİYET BELGESİ BAŞVURU FORMU EKLERİ

LEARNING AGREEMENT FOR STUDIES

T.C. ULAŞTIRMA, DENİZCİLİK VE HABERLEŞME BAKANLIĞI Sivil Havacılık Genel Müdürlüğü TÜM HAVAYOLU İŞLETMELERİNE

FORMU CERTIFICATION APPLICATION FORM. (2) Vergi Dairesi No / Vat No : (3) Adresi / Address : (4) Posta Kodu / ZIP Code : (5) Şehir / City :

ÖZEL UÇUŞ İZNİ BELGESİ VERİLME KURALLARINA İLİŞKİN TALİMAT (SHT-ÖUIB) BİRİNCİ BÖLÜM Amaç, Kapsam, Dayanak ve Tanımlar

ÖRNEKTİR - SAMPLE. RCSummer Ön Kayıt Formu Örneği - Sample Pre-Registration Form

PROJE FİŞLERİNDE BÜTÇE. Rıfat Ünal Sayman 15 Ocak 2010 Ankara.

Dersin Kodu Dersin Adı Dersin Türü Yıl Yarıyıl AKTS

.. ÜNİVERSİTESİ UNIVERSITY ÖĞRENCİ NİHAİ RAPORU STUDENT FINAL REPORT

PROFESSIONAL DEVELOPMENT POLICY OPTIONS

YABANCI ARAŞTIRMACILAR İÇİN BİLİMSEL ARAŞTIRMA İZİN PROSEDÜRÜ

A.Ş. ÖZEL / FASON ÜRETİM

İTÜ DERS KATALOG FORMU (COURSE CATALOGUE FORM)

Corporate Design Manual bio.inspecta Ltd. bio.inspecta Ltd. Kurumsal Tasarım El Kitabı

STAJ RAPORU TRAINING REPORT

BAŞVURU ŞİFRE EDİNME EKRANI/APPLICATION PASSWORD ACQUISITION SCREEN

Tel:(Ev/Home) E-posta/ Cep Telefonu/Mobile:

FORTEKS TEKSTIL SAN VE TIC LTD STI. SMETA Audit Type: 2-Pillar 4-Pillar. Audit company: SGS Turkey Report reference: IS14K Date:

VADELİ İŞLEM VE OPSİYON PİYASASI DERIVATIVES MARKET

Prof. Dr. N. Lerzan ÖZKALE

Producer Name ss: Narkonteks Tekstil Ihr. Ith. San Ve Tic A.S. Sti DBID: Audit Date: 13/06/2017 Audit ID: Audit Type: Full Audit

LEARNING AGREEMENT FOR STUDIES

Teknoloji Servisleri; (Technology Services)

BAŞVURU FORMU (APPLİCATION FORM)

UÇUŞA ELVERİŞLİLİK SERTİFİKASI VERİLME VE/VEYA TEMDİT EDİLME TALİMATI (SHT-UE) BİRİNCİ BÖLÜM Amaç, Kapsam, Hukuki Dayanak ve Tanımlar

THE DESIGN AND USE OF CONTINUOUS GNSS REFERENCE NETWORKS. by Özgür Avcı B.S., Istanbul Technical University, 2003

Turkish Vessel Monitoring System. Turkish VMS

TÜRKAK TÜRK AKREDITASYON KURUMU TURKISH ACCREDITATION AGENCY. TÜV Rheinland. Tel: Fax: Deney Raporu Test report

Section 04 ISO 22000:2005

Savunma Sanayii Müsteşarlığı (SSM)

GEN 3.2 HAVACILIK HARİTALARI GEN 3.2 AERONAUTICAL CHARTS. 1. Yetkili birimler. 1. Responsible Services. 2. Haritaların Güncelleştirilmesi:

T.C. KÜLTÜR VE TURİZM BAKANLIĞI Sinema Genel Müdürlüğü

UÇAK PARÇA İMALAT SERTİFİKASYON YÖNETİMİ. Bölüm 1. Sivil Havacılık Otoriteleri ve Kuruluşları

YMO TEKSTIL INSAAT SAN. IC VE DIS TIC. LTD. STI. Site country: YMO TEKSTIL INSAAT SAN. IC VE DIS TIC. LTD. STI. SMETA Audit Type: 2-Pillar 4-Pillar

AKDENİZ ÜNİVERSİTESİ MÜHENDİSLİK FAKÜLTESİ ÇEVRE MÜHENDİSLİĞİ BÖLÜMÜ ÇEV181 TEKNİK İNGİLİZCE I

Gıda, Tarım ve Hayvancılık Bakanlığından:

KABLO DÖŞEME GEMİLERİ CABLE LAYING VESSELS

T.C. AKÇAKOCA SCHOOL OF TOURISM AND HOTEL MANAGEMENT DUZCE UNIVERSITY TRAINING FILE

Vakko Tekstil ve Hazir Giyim Sanayi Isletmeleri A.S. Company Profile- Outlook, Business Segments, Competitors, Goods and Services, SWOT and Financial

PARS EĞİTİM & DANIŞMANLIK İÇ DENETİM. Temel Uygulamalar. Fırat ÖZEL 8/8/2011

Transkript:

Bölüm 1 Genel / Part 1: General Intermediate audit Change Change Continuation Continuation Kuruluşun Posta Adresi / CAMO s postal address: Kuruluşun email Adresi / CAMO s email address: Kuruluşun Yönetim Binası Adresi / Principal Place of Business: Kuruluşun Denetlenen Adresleri Address of Facility(ies) Audited: Gözetim Periyodu Surveillance Cycle Başlangıç From Bitiş To Denetleme Referansı Audit Reference Denetleme Tarihleri Date(s) of Audit Denetleme türü Type of audit (on site, desktop) Denetleme Amacı Nature of Audit(initial, change.. Görüşülen Personel Person(s) Interviewed Form 13 Bölüm 1 doldurulma tarihi Date of Form 13, part 1 completion Sayfa Page 1 7

Intermediate audit Change Change Continuation Continuation Part 2: SHY-M Compliance Audit Review The five columns may be labelled and used as necessary to record the approval class &/or product line reviewed. Against each column used of the following Part-M/SHT-M please either tick () the box if satisfied with compliance or cross () the box if not satisfied with compliance and specify the reference of the Part 4 finding next to the box or enter N/A where an item is not applicable or N/R when applicable but not reviewed. Para Subject Finding n Finding n Finding n Finding n Finding n M.A 703 M.A 704 M.A 705 M.A 706 M.A 707 M.A 708 M.A 201 M.A 202 M.A 302 M.A 303 M.A 304 M.A 305 M.A 306 M.A307 M.A709 M.A.710 M.A.711 M.A.712 M.A.713 M.A.714 M.A.716 Extent of approval Continuing airworthiness management exposition (see Part 3) Facilities Personnel requirements Airworthiness review staff Continuing airworthiness management Responsibilities Occurrence reporting Aircraft maintenance programme Airworthiness directives Data for modifications and repairs Aircraft continuing airworthiness record system Operator's technical log system Transfer of aircraft continuing airworthiness records Documentation Airworthiness review Privileges of the organisation Quality system Changes to the approved continuing airworthiness organisation Record keeping Findings Form 13 Bölüm 2 doldurulma tarihi / Date of Form 13, part 2 completion Sayfa Page 2 7

Intermediate audit Change Change Continuation Continuation PART 3: Compliance with SHT-M Continuing Airworthiness Management Organisation Manual (CAME/SEK) Please either tick () the box if satisfied with compliance; or cross (X) if not satisfied with compliance and specify the reference of the Part 4 finding; or enter N/A where an item is not applicable; or N/R when applicable but not reviewed. Part 0 General 0.1 Corporate commitment by the accountable manager. 0.2 General information. 0.3 Management personnel. 0.4 Management Organisation Chart. 0.5 Notification procedure to the competent authority regarding changes to the organisation s activities / approval / location / personnel. 0.6 Exposition amendment procedures. Part 1 1.1 Continuing airworthiness management procedures Aircraft technical log utilisation and MEL application (commercial air transport). Aircraft continuing airworthiness record system utilisation (non commercial air transport). 1.2 Aircraft maintenance programmes development amendment and approval. 1.3 Time and continuing airworthiness records, responsibilities, retention, access. 1.4 Accomplishment and control of airworthiness directives. 1.5 Analysis of the effectiveness of the maintenance programme(s). 1.6 Non mandatory modification embodiment policy. 1.7 Major modification standards. 1.8 Defect reports. 1.9 Engineering activity. 1.10 Reliability programmes. 1.11 Pre-flight inspections. 1.12 Aircraft weighing. 1.13 Check flight procedures. Part 2 Quality system 2.1 Continuing airworthiness quality policy, plan and audits procedure. 2.2 Monitoring of continuing airworthiness management activities. 2.3 Monitoring of the effectiveness of the maintenance programme(s). 2.4 Monitoring that all maintenance is carried out by an appropriate maintenance organisation. 2.5 Monitoring that all contracted maintenance is carried out in accordance with the contract, including subcontractors used by the maintenance contractor. 2.6 Quality audit personnel. Part 3 Contracted maintenance 3.1 Maintenance contractor selection procedure. 3.2 Detailed list of maintenance contractors 3.3 Quality audit of aircraft. Sayfa Page 3 7

Intermediate audit Change Change Continuation Continuation PART 3: Compliance with SHT-M Continuing Airworthiness Management Organisation Manual (CAME/SEK) Please either tick () the box if satisfied with compliance; or cross (X) if not satisfied with compliance and specify the reference of the Part 4 finding; or enter N/A where an item is not applicable; or N/R when applicable but not reviewed. Part 4 Airworthiness review procedures 4.1 Airworthiness review staff. 4.2 Review of aircraft records. 4.3 Physical survey. 4.4 Additional procedures for recommendations to competent authorities for the import of aircraft. 4.5 Recommendations to competent authorities for the issue of airworthiness review certificates 4.6 Issuance of airworthiness review certificates 4.7 Airworthiness review records, responsibilities, retention and access. Part 4B Permit to fly procedures 4B.1 Conformity with approved flight conditions 4B.2 Issue of permit to fly under the CAMO privilege 4B.3 Permit to fly authorised signatories 4B.4 Interface with the local authority for the flight 4B.5 Permit to fly records, responsibilities, retention and access. Part 5 Appendices 5.1 Sample Documents. 5.2 List of airworthiness review staff 5.3 List of subcontractors as per M.A.711 (a) 3 and AMC M.A.201 (h)1. 5.4 List of approved maintenance organisations contracted. 5.5 Copy of contracts for sub-contracted work (appendix 2 to AMC M.A.201 (h)1. 5.6 Copy of contracts with approved maintenance organisations. Form 13 Bölüm 3 doldurulma tarihi / Date of Form 13, part 3 completion Sayfa Page 4 7

Intermediate audit Change Change Continuation Continuation Part 4: Findings SHY-M Compliance Status Each level 1 and 2 finding should be recorded whether it has been rectified or not and should be identified by a simple cross reference to the Part 2 requirement. All non-rectified findings should be copied in writing to the organisation for the necessary corrective action. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. SHT-M ref. Audit Reference(s) / Findings L e v Corrective Action or Corrective Action Plan acceptance e Date Date l Due Closed Reference Form 13 Bölüm 4 doldurulma tarihi / Date of Form 13, part 4 completion Sayfa Page 5 7

Intermediate audit Change Change Continuation Continuation Bölüm 5: SHY-M Onay Tavsiyesi Part 5: SHY-M Approval Recommendation Ara denetim için bu bölümün doldurulması gerekmemekte Not required for intermediate audit report Talep Edilen Yetki /SHGM Form 2M tarihi Requested Approval Rating / SHGM Form 2M(s) date(s): İlk Yetkilendirme / Bu kuruluş için tavsiye edilen yetki kapsamı detayı ün 6ncı bölümünde yer almaktadır. The SHY-M scope of approval recommended for this organisation is detailed in the - Part 6 / Change Son Yetki Belgesi SHGM Form 14 ün Tarih ve Revizyonu Date and revision of the last SHGM Form 14 Certificate Tavsiye edilen değişiklik Yetki Belgesi SHGM Form 14 te değişiklik gerektiriyor mu? Evet Hayır Does the recommended change require the amendment of the SHGM Form 14 certificate Yes No Cevap Evet ise tavsiye edilen yetki kapsamı detayı ün 6ncı bölümünde yer almaktadır. If yes,only the change to the SHY-M scope of approval recommended is detailed in the - Part 6 / Continuation SHGM Form 14: Kuruluşun yukarıda belirtilen Yetki Belgesi SHGM Form 14 üzerinde belirtilen yetkilerinin devam etmesi tavsiye edilmektedir. It is recommended that the SHY-M scope of approval specified in above mentioned SHGM Form 14 be continued. Suspension / limitation The suspension is recommended in the part 6: and/or The following Limitation is recommended: Re-instatement It is recommended to re-instate the scope of approval listed in the part 6 Additional comment(s) to support the recommendation: Form 13 Bölüm 5 doldurulma tarihi / Date of Form 13, part 5 completion Form 13 Kalite Kontrol Değerlendirmesi Form 13 Review for Quality Check by İsim/Name İmza/Signature Tarih/Date Sayfa Page 6 7

Intermediate audit Change Change Continuation Continuation Bölüm 6: SHY-M Onay Kapsamı Part 6: SHY-M Scope of Approval Aircraft type/series/group Airworthiness review authorization Permits to fly authorization Organization(s) working under Quality System Status (1) (1) N: new - C : cancelled - SU : suspended - RI : re-instated - NA : not applicable Sayfa Page 7 7